My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03067
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:29 PM
Creation date
10/11/2006 11:31:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.856
Description
Salinity Control Inventory Lower Gunnison Basin - Colorado River Salinity Control Program
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
9/1/1976
Title
On-Farm Salinity Control Investigation and Plan of Work
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />12. Develop different plan alternatives. Display the effects and <br />Impacts of the alternatives. After obtaining publ:c reaction to <br />the various alternatives, select a recommended plan, <br /> <br />13. The recommended plan will be written up in draft form and the <br />necessary interim reports made. A public meeting of interested <br />parties will be held in order to obtain their opinion of the draft <br />plan. <br /> <br />14. A final plan will be prepared and published as a special salinity <br />project report. <br /> <br />15. During the course of the field inventory, significant nonirrigated <br />areas that appear to be erosion and sediment factors wi 11 be noted. <br /> <br />Schedule of Activities <br /> <br />The Lower Gunnison Sal inity Control Project evaluation wil I be timed to <br />coincide with the schedule for the USBR Lower Gunnison Basin Unit studi~, <br />scheduled for completion in FY 1977. The Soil Conservation Service will <br />work closely with the Bureau of Reclamation to provide consistent evalua- <br />tions and exchange of data as it becomes available. Specific funding <br />and staffing estimates are presented in Table 1. <br /> <br />Funding and Staffing <br /> <br />All funding for the Lower Gunnison Unit Salinity Control Project studies <br />by the USDA will come from regular river basin investigation funds (RB. <br />09) of the Soil Conservation Service. Prel iminary estimates indicate <br />that the Lower Gunnison Unit Salinity Control studies would require <br />approximately 1,060 man-days and an estimated $154,000 in funding to <br />complete the special requirements of the sal inity control study. <br /> <br />Progress Reports <br /> <br />Progress reports on the Lower Gunnison Basin Sal inity Control studies <br />. will be prepared annually (November) except for significant accompl ish- <br />ments and phases of work needed for coordination with other agencies. <br />The coordinating committee will determine the specific requirements for <br />progress reports and their distribution. <br /> <br />003091 <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.