Laserfiche WebLink
<br />" <br /> <br />-.J <br /> <br />-.J <br /> <br />s <br /> <br />a proposed on-s~~e3~ reservoir" to be l~c~tej i~~~2d:2t21y e0st of G~cLl~~ en <br />t~e ~,~uth Pla:-.t~ Rive.::::. The t-!.~l.'d,i'.~ cos": ::igur~3 ~...'et-12 .Je'..relc.ped i!'. lat.e <br />1982 and expr~ss u cost of $658 per acre-foot of stor~ge. <br /> <br />Ti"it: '!:"e.~er~,...oirs propo~:8-:1 ~~3 F2.:t of the. Cache ia PO'..!.:i::';!. P:-ajE.ct '....auld t.-:; <br />locuted on th~ CJ.':he la Poudra River ilo!:'tn'..;est of Fort I..~olli~;s. The <br />figu.r2S for the se'.:,~n compOilents of the Ca.che Id PO'Jd.!.'~ ?rGject ~.:-:::r~ <br />derived in mid-1083 und r~nged from ~340 - $1,:80 p2r acr~-fQQt cf stor2ge <br />~p~ce de~21oped. <br /> <br />TABLE 3 <br /> <br />Cost or Developing Reservoir, Storage Space for <br />Selected Reservoir Sites Along the <br />Front Range of Colorado <br />(1982-1983) <br /> <br />Reservoir <br /> <br />Storage Capacity <br />(acre-reee) <br /> <br />Total <br />- <br />Cost <br /> <br />Cost <br />Per Acre-root <br /> <br />i'ldr-~OWS <br />i:ardin <br /> <br />1,100,,000 <br />400,000 <br /> <br />S389,000,000 <br />S263,000,000 <br /> <br />S 354 <br />S 658 <br /> <br />Cache la Poud:-e p.:-oject: <br />Gr~y t-1ountain 200,000 S U5, 000, COO <br />Idy lwilde 200,000 S 84,000,COO <br />.:::lk:lOrn 196,000 S 82,OOO,GOO <br />Indian He adol......s 190,000 S 79,000,000 <br />Ir.dian Neadm"/3 S8,DOa $ 36,000,000 <br />Rockwell 40,000 S 47,200,000 <br />~ockT../e 11 86,000 0 72,600,000 <br />y <br />Rcc'(\,;e U 50,400 $ 54,300,000 <br />~JeiV Seam.J.n 200,000 S 68,000,000 <br />Upper Poudre 97,000 S 58,000,000 <br /> <br />~ 575 <br />$ 420 <br />$ 418 <br />" 416 <br />S 621 <br />Sl,180 <br />S 844 <br />Sl,077 <br />S 340 <br />S 597 <br /> <br />Sources: Bureau of Reclamation, Narrows Unit - Colorado, Report ~Q~er 3, <br />Denver, Colorado, July 1983. <br />Colorado Water Conservation Board, Hardin Dam Project Study, DameS & Moore, <br />Denver, Colorado, December 1982. <br />ColoradO Wate:- Conservation Board, Cache la Poudre Project, 1'udor Engineer- <br />ing Ccmpany, Denver, Colorado, July 1983. <br /> <br />Utilizing the above figures, an average cost of develoI;-ing storage is <br />conputed to be S478/acre-foot. If 10% simple interest is added for three <br />years, since SO!!1e of the numbers are two to tr..ree years old, an average <br />ccst of S636/acre-foot is obtained. Thus, the total cost of acquiring <br />4,375 a.::re-feet of sp2.ce in Bear Creek L~i-:.8 \.;ould eCil.lal $~/782,50C6 Tr.e <br />costs would be alloc~ted as shown in Table 4. <br /> <br />The Central Conservancy District proposes to enter iIlto a contract with the <br />u. s. ;'.rmy Corps of Engi:1eers whereby the entire t;, 375 2sr8- ret;":. or space <br />re:.;uested. is purchased by -::'he Central Conservancy Dist!'ic"t. for <br />