Laserfiche WebLink
<br />" <br /> <br />" <br /> <br />------! <br /> <br />-.J <br />STATE OF COLORi\OO <br /> <br />721 St::!:tg Cen'te~nial Suildlng <br />13i3 Sherman Street <br />Oe~verJ Color~oo 80203 <br />Phone: (303) 856-3441 <br /> <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department oi ,'\la!ural Resources <br /> <br />11 <br /> <br />E <br /> <br />M <br /> <br />o <br /> <br />R <br /> <br />A <br /> <br />N <br /> <br />D <br /> <br />U <br /> <br />M <br /> <br />Richard D. lamm <br />Governor <br /> <br />). \....dliam.\t1cOonaid <br />Director <br /> <br />FROM: <br /> <br />Members, C;qCB <br />Bill McDonald (rlLD ' <br />November 7, 1984 <br /> <br />David W. Walker <br />Oepuly Dlrec:or <br /> <br />TO: <br /> <br />DATE: <br /> <br />SUBJECT: Agenda Item 11, November 15, 1984, Board Meeting-- <br />Bear Creek Reservoir Space Allocation <br /> <br />Introduction <br /> <br />At its July meeting, the Board asked that I inform the Omaha <br />District, Corps of Engineers, that it was most anxious to have <br />the Corps reach a final determination on the availability and <br />allocation of space in Bear Creek Reservoir for water <br />conservation storage purposes. The Board also proposed that it <br />take the responsibility for bringing together interested parties <br />to resolve issues concerning the allocation of any available <br />space. <br /> <br />As I reported at the September meeting, the Corps indicated <br />in its response to the Board that a final determination on the <br />availability and allocation of space was awaiting the completion <br />of the Corps' Denver Tri-Lakes System Operations Study. Since <br />the study was not completed prior to the September Board meeting, <br />no further action was taken at that time. <br /> <br />Discussion <br /> <br />We have just this week received preliminary results of the <br />study from the Corps. However, a complete report and final <br />analysis is still being prepared and we have a number of <br />questions about the use and interpretation of the information <br />received thus far. As a consequence, it will not be possible for <br />the staff to prepare a thorough analysis and discussion of the <br />study's results for the Board meeting. <br /> <br />(over) <br /> <br />214 <br />ai/11 <br />