My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03040
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:21 PM
Creation date
10/11/2006 11:30:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
10/1/2001
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Summary of Actual Operations Water Year 2001
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />~" I' <br />{.,JI-t <br /> <br />May 24, 1985 <br />Julyo1,1985 <br />August 1985 <br />November 27, 1985 <br />May 7,1986 <br />June 1986 <br />November 10, 1987 <br />November 17, 1989 <br /> <br />July 1990 <br />August 14, 1990 <br /> <br />September 28, 1990 <br /> <br />November 1990 <br />July 21,1992 <br /> <br />September 29, 1994 <br /> <br />May 15, 1995 <br /> <br />July 7,1995 <br />July 18, 1995 <br />July 1997 <br /> <br />May 1999 <br />July 2000 <br />July 11, 2000 <br /> <br />September 11, 2001 <br /> <br />Began storing water under Arkansas River Decree <br />Initial diversion through Fountain Valley Conduit <br />Ruedi Hydroplant began operations <br />Twin Lakes pipeline began operations <br />Sugar Loaf Hydroplant began operations <br />Imports restricted due to high east slope storage <br />Winter water storage decree approved and signed <br />Completed the removal of dikes and constructed the <br />bypass channel around the old outlet works in the old <br />Twin Lakes dam . <br />Initial release from:Twin Lakes Reservoir for recreational <br />benefits on the Arkansas River <br />Initial release from Ruedi Reservoir for endangered fish <br />(conservation flows pursuant to the biological opinion) in <br />the Colorado River's "15-mile reach" for the U.S. Fish & <br />Wildlife Service frqm water leased by the Colorado Water <br />Conservation Board <br />Dedication of Puel)lo Fish Hatchery and the completion of <br />construction on the Fryingpan-Arkansas Project ceremony <br />Final winter storage decree signed by court <br />Dedication of Leadville Mine Drainage Tunnel Water <br />Treatment Plant <br />Transfer of Phase II of the Pueblo Fish Hatchery at <br />Pueblo Reservoir to Colorado Division of Wildlife <br />Final transfer of recreational facilities at Pueblo to the <br />Department of Parks and Outdoor Recreation <br />Began storing water under Arkansas River Decree <br />Began restricting imports due to high east slope storage <br />Reservoir level at Pueblo Reservoir restricted after a <br />routine risk assessment of Pueblo Dam was completed <br />and raised concern about the foundation below the <br />spillway section of the dam <br />Reservoir restriction lifted <br />Risk Analysis Study for Pueblo Dam completed <br />Long-term contract between United States <br />Government and the Pueblo Board of Water Works <br />executed <br />As a result of the terrorist attacks on September 11, 2001, <br />all Fryingpan-Arkansas Project facilities were closed to the <br />public, The facilities remained closed until security <br />measures to safeguard the federal investment were <br />implemented, Reclamation has maintained a heightened <br />level of security at Fry-Ark facilities since that time. <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.