My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03036
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:20 PM
Creation date
10/11/2006 11:30:28 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.127.A
Description
Savery-Pot Hook Project
Basin
Yampa/White
Date
3/1/1976
Title
CWCB: Savery-Pot Hook Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />I' <br />0) <br />.-l April 1976 <br />...-i <br /> <br />May 1976 <br />June 1976 <br /> <br />August 1976 <br /> <br />September 1976 <br /> <br />November 1976 <br /> <br />December 1976 <br />January 1977 <br /> <br />March 1977 <br /> <br />April 1977 <br /> <br />May 1977 <br /> <br />June 1977 <br /> <br />. <br /> <br />. <br /> <br />Field review of revised draft of environmental <br />impact statement completed. <br /> <br />Revised draft EIS is filed with the Council of <br />Environmental Quality and distributed for review. <br /> <br />Review period ends. <br /> <br />Public meeting on revised draft of EIS is held. <br /> <br />Design data collection on Pot Hook dam and <br />reservoir and on the temporary camp is initiated. <br /> <br />Final EIS sent to Regional Director. <br /> <br />Final EIS sent to Reclamation Commissioner. <br /> <br />Final EIS sent to CEQ. <br /> <br />Specifications on Pot Hook dam and reservoir and <br />on the temporary camp near Baggs, wyoming are <br />initiated. <br /> <br />Design data collection begins on the access road <br />to Savery Dam. <br /> <br />The repayment contract is executed. <br /> <br />Initial purchase of right-of-way for Moffat County <br />Roads relocation, the temporary camp and Pot Hook <br />dam and reservoir is begun. Right-of-way purchases <br />on other project features will follow as required. <br /> <br />The relocation agreement for the construction of <br />Moffat County Roads is entered into. <br /> <br />Specifications are issued for the temporary camp. <br /> <br />The repayment contract is validated. <br /> <br />An award for the construction of the temporary <br />camp is made. <br /> <br />Specifications are issued for Pot Hook dam and <br />reservoir. <br /> <br />Design data collection on Dolan Mesa canal, <br />diversion dam, and laterals is initiated. <br /> <br />The prime contract for Pot Hook dam and reservoir <br />is awarded. <br /> <br />Specifications are issued for Pot Hook canal and <br />laterals. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.