Laserfiche WebLink
<br />c'"' <br />co <br />1.-''') E. <br />..-I <br />;'~) <br />C.l <br /> <br />Conveyance Channel Water Management Structures <br /> <br />Three conveyance channel turnout structures each with a capacity to deliver <br />4,500 acre-feet per year will be provided on the Alamosa NWR. One turnout <br />structure will be located near the intersection of the conveyance channel and <br />the Chicago ditch, while a second turnout structure will be near the Mum ditch. <br />Both of these structures will divert waters from the channel by gravity. A <br />third turnout structure will be located near the intersection'of the conveyance <br />channel and the Denver and Rio Grande railroad. Water diverted from this <br />turnout will have to be pumped. <br /> <br />Two conveyance channel turnout structures with a total capacity of 800 acre-feet <br />per year will be provided on the Blanca WHA. One turnout structure will be <br />located on the Blanca WHA on the north edge of the W. 1/2 sec. 4., T. 38 N., R. <br />12 E.; the second turnout will be located on southern portion of Blanca WHA near <br />the existing Mallard 4 pond. Waters from the channel will be diverted by <br />gravity. <br /> <br />F. Replacement of Structures <br /> <br />Some irrigation structures could be affected due to conveyance channel <br />construction through Alamosa NWR. The conveyance channel would cross the <br />Chicago and ~fum ditches, two smaller canals, and one road in the Alamosa NWR. <br />The two ditches and two canals would be siphoned under the conveyance channel, <br />while the channel would be siphoned under the road. In addition to turnout <br />structures described in section E above, a deep artesian well capable of deliv- <br />ering 800 acre-feet of water in 90 days would be provided. Artesian water <br />rights for the deep well would be transferred to Alamosa NWR after Emperious <br />Estate lands are acquired. A canal west of the third northernmost turnout could <br />be provided if the deep artesian well proved unfeasible. <br /> <br />Approximately 4,000 linear feet of existing dikes and 10 waterfowl nesting <br />islands (which provide waterfowl habitat) will no longer be intensively managed <br />as a result of conveyance channel construction through the Blanca WHA. The <br />project water to be used on Blanca WHA to mitigate drawdown pumping effects <br />resulting from the project should be deHvered to these affected lands. To <br />accomplish this purpose, approximately 3,400 linear feet of pipe lateral, <br />2,500 linear feet of ditches, and an energy dissipating pipe outlet structure <br />will be needed to deliver conveyance channel water from the northern turnout to <br />affected lands. Approximately 4,000 linear feet of dikes, 1,700 linear feet of <br />ditches, 150 linear feet of pipe lateral, and an energy dissipating pipe outlet <br />structure will be needed to deliver water to affected lands. Ten duck-nesting <br />islands will also be provided. Funds to accomplish the construction of the <br />above structures will be provided. <br />G. Land and Water Right Acquisition <br /> <br />The west 1/2 sec. 4, T. 38 N., R. 12 E. will be acquired in fee .with appurtenant <br />water rights to replace lands lost by conveyance channel construction, severance <br /> <br />16 <br />