My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03001
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:07 PM
Creation date
10/11/2006 11:29:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Metro Water Supply Investigation - MWSI
State
CO
Basin
South Platte
Date
8/1/1995
Author
Hydrosphere, HRS
Title
Phase II Conjunctive Use Summary Report - Draft
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MWSI Project <br />Phase II Conjunctive Use Sununary Report - DRAFT <br /> <br />August 22, 1995 <br /> <br />TOTAL WELL & EQUIPMENT COST. <br />well & pump cost + well pumping energy cost <br /> <br />PIPELINE COST. <br />$845 af/yr' production <br /> <br />TREA TMENT COST. <br />$8,15 · production <br /> <br />EASEMENT COST. <br />$10 · production <br /> <br />TOTAL CONSTRUCTION COST: <br />well & pump cost + pipeline cost <br /> <br />CONTINGENCIES <br />total construction cost · 0.1 <br /> <br />ENGINEERING/MANAGEMENT COST: <br />(total construction cost + contingencies) · 0,1 + (0,1 · total energy cost) <br /> <br />TOTAL CAPITAL COST: <br />total construction cost + contingencies + engineering/mngmt cost <br /> <br />0& M LABOR, SUPPLIES, MATERiALS: <br /> <br />[0,1 · (total construction cost + contingencies + engineeringlmngmt cost) ] + <br />(0,25 · well pumping cost) <br /> <br />TOTAL 0 & M COST: <br />o & M labor, sup" materials. + treatment cost + easement cost + energy cost <br /> <br />ESTIMATED WELLFIELD COST: <br />total capital cost + total 0 & M cost <br /> <br />COST PER ACRE.FOOT: <br />estimated wellfield cost / production <br /> <br />COST PER IOOO GAL ,. <br />cost per acre-foot / 325,83 <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.