My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02989
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP02989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:03 PM
Creation date
10/11/2006 11:29:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - BOR - Upper Colorado Region - Salt Lake City
State
CO
Basin
Statewide
Date
9/23/1977
Author
David L Crandall
Title
CWCB Regular Board Meeting - Activities Report by Regional Director David L Crandall
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />0017'P <br /> <br />. <br /> <br />. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />" <br />.':':'~".;.::'-'-"'"""" <br /> <br />IV. ADVANCED PLANNING PROGRAM <br /> <br />A, ANIMAS-LA PLATA PROJECT <br /> <br />1. FINAL PLAN SELECTED <br />2. FEASIBILITY DESIGNS AND COST ESTIMATES FOR PROJECT FEATURES <br /> <br />PROGRESSING <br />;.7-V19L.- <br />3. ~ EIS COMPLETION SCHEDULED EARLY FY 79 BUT COULD <br /> <br />SLIP TO LATE FY 79 <br /> <br />a. DELAYS IN COMPUTING FEASIBILITY DESIGNS AND COST <br /> <br />ESTI}~TES. WORK LOADS, SAFETY OF DAMS PROGRM1S, CONTRIBUTING <br /> <br />TO DELAY. CONTRACTING OUT I-IORK AS MUCH AS POSSIBLE <br /> <br />4. CONTRACT NEGOTIATIONS WITH EXISTING DITCH COMPANIES <br /> <br />INITIATED <br /> <br />/~1/~4,7~P <br />5. REPAYMENT CONTRACT NEGOTIATIONS TO BE 081WhETB~ I-IHEN <br /> <br />ENLARGED CONSERVANCY DISTRICT FOR}lED <br /> <br />a. CONTRACT SIGNING SCHEDULED EARLY 1979 <br /> <br />6. DPR COMPLETION SCHEDULED FALL 1978 <br /> <br />7. FY 78 PROGRAM - $350,000 <br />B. SAN MIGUEL <br /> <br />1. PLAN SELECTED CONTINGENT UPON FINAL LAND CLASSIFICATION <br /> <br />AND COLO-UTE ELECTRIC ASSOCIATION PARTICIPATION <br /> <br />2. FEASIBILITY DESIGNS AND COST ESTIMATES FOR PROJECT <br /> <br />FEATURES PROGRESSING <br /> <br />3. DEFINITE PLAN REPORT - COMPLETION SCHEDULED SUMMER 1979 <br /> <br />4. EIS COMPLETION SCHEDULED - SUMMER 1979 <br /> <br /> <br />6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.