My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02989
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP02989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:03 PM
Creation date
10/11/2006 11:29:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - BOR - Upper Colorado Region - Salt Lake City
State
CO
Basin
Statewide
Date
9/23/1977
Author
David L Crandall
Title
CWCB Regular Board Meeting - Activities Report by Regional Director David L Crandall
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />;\;)17 H <br /> <br />. <br /> <br />. <br /> <br />4' <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. ~. <':::.;;.;..~--~-", <br /> <br />F. LAKE MEAD <br />1. AT ELEVATION 1,179 FEET SEPTEMBER 15 WITH AVAILABLE <br />STORAGE OF 20.0 MAF <br />a. 77% OF ACTIVE STORAGE <br />b. RESERVOIR ABOUT 1 FOOT HIGHER THAN YEAR AGO <br />2. SHOULD RISE TO ELEVATION 1,183 FEET BY END OF FEBRUARY 1978 <br />III. CONSTRUCTION ACTIVITIES <br />A. CRYSTAL DAM AND POWERPLANT <br />1. CONTRACTOR CONTINUING GENERAL CLEANUP, WIRING, PAINTING, <br />ETC. <br /> <br />a. WORK ALMOST COMPLETE <br />2. POWERPLANT ELECTRICAL COMPLETION - CONTRACTOR TO BEGIN <br />ON-SITE HORK. WORK DELAYED BECAUSE OF EQUIPMENT PURCHASE <br />DIFFICULTIES <br />a. ANTICIPATED ON-LINE IN EARLY 1978 <br />3. CONTRACTOR MILO WERNER CO}WANY, MONTROSE, COLORADO, STARTED <br />WORK IN AUGUST TO CLEAR TREES AND BRUSH FROM BLACK CANYON WALLS <br />BETWEEN HIGH AND LOH WATER LINES OF RESERVOIR <br />B. RIFLE SUBSTATION - ALL WORK COMPLETED AUGUST 1977 <br />C. DOLORES PROJECT <br />1. PRECONSTRUCTION WORK UNDERWAY: <br />2. McPHEE DAM PRIME CONTRACT - AWARD SCHEDULED FALL 1978 <br />3. McPHEE ACCESS ROAD CONTRACT - TO BE ADVERTISED EARLY <br />OCTOBER 1977 <br />4. CONTRACT TO RELOCATE GAS PIPELINE TO BE AWARDED - <br />SEPTEMBER 1977 <br /> <br /> <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.