Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />w <br />U1 <br />Z <br />w <br />(L <br />X <br />w <br /> <br />z <br />w <br />:" <br />z <br /> <br />co <br /> <br />. <br /> <br />J <br /> <br /><t <br /> <br />:} <br />oJ <br />..; <br />::J <br />o <br />:] <br />CO <br />(L <br />w <br />CO <br /> <br />. <br /> <br />o <br />r-) <br />~- <br />W <br />c..o <br />.0 <br /> <br />Corps of Engineers <br />Revised July 1984 <br /> <br />CIMARRON AND CANADIAN RIVER BASIN <br /> <br />74, Arcadia Lake, OK <br />STATUS: Construction began in October 1980 and is 51 percent complete. <br />Estimated Federal cost is $82,600,000. <br /> <br />DESCRIPTION: (TD) Lake project on the Deep Fork River providing for flood <br />control, water supply, and recreation. <br /> <br />SPONSOR: City of Edmond, OK <br /> <br />80, Central Oklahoma Urban Study, OK <br />STATUS: Study was initiated in FY 74. Local interests elected to accomplish <br />wastewater studies by private consultant, water supply and ground water studies <br />by other agencies. Local flood problems will be investigated as a part of the <br />Canadian River General Investigation. A letter report recommending disconti- <br />nuance of the study was approved by OCE on 28 May 1976. <br /> <br />DESCRIPTION: (TD) A survey-scope study of all water resource problems includ- <br />ing urban runoff and wastewater management in the central Oklahoma area. <br /> <br />SPONSOR: None <br /> <br />97, North Canadian Wastewater Treatment Plant, OK <br />STATUS: Detailed studies under Section 205 continuing authority were completed <br />in September 1983. Plans and specifications in preparation for beginning of <br />construction are underway with project completion scheduled for 1986. <br /> <br />DESCRIPTION: (TS) <br /> <br />A levee plan is recommended. <br /> <br />SPONSOR: Oklahoma City, OK <br /> <br />48 <br />