My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02985
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP02985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:02 PM
Creation date
10/11/2006 11:28:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC
Basin
Arkansas
Water Division
2
Date
3/1/1982
Title
Arkansas-White-Red Basins Water Resources Activities Report --- Part 1 of 2 -- Cover Page - Page 141
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,i. <br />. <br />. <br /> 0 <br />. c, <br />,.... <br />(..;.) <br /> 00 - <br /> - <br /> N <br /> <br />w <br />~ <br />~ <br />,. <br />8 <br /> <br />- <br />:; <br />tl <br />~ <br />:: <br />q: <br />. <br />~ <br /> <br />r <br />~ <br /> <br />;:; <br /> <br />:D <br />d <br />~ <br /> <br /><lo <br />~ <br /> <br />, <br />. <br /> <br />Bureau of Recla~~tion <br />Revised July 1964 <br /> <br />CIMMARON AND CANADIAN RIVER BASINS <br /> <br />57, Geary Project, OK (Inactive) <br /> <br />STATUS: Appraisal-grade investigations by the Bureau of Reclamation of the <br />project area were completed in 1973. Comparative studies of seven structural <br />alternatives in the Canadian River Basin indicated that the Hydro site would <br />probably be a favorable site. The Hydro site would yield about 126,500 acre- <br />feet. Feasibility investigations of the Hydro site were initiated in fiscal <br />year 1978. The study is complete, and a concluding report was released for <br />public use. The report indicates that surface water development at this time <br />would be premature and that further study of the project was not warranted. <br /> <br />DESCRIPTION: The study area included that portion of the Canadian River Basin <br />in west-central Oklahoma extending from Oklahoma City upstream about 140 miles <br />to Camargo in Dewey County, Oklahoma. <br /> <br />During the feasibility-level investigation, the Bureau identified and evaluated <br />various alternatives to meet projected future water-oriented needs of the proj- <br />ect area including M&I needs in the central Oklahoma area. <br /> <br />65, Wilburton Project, OK (Inactive) <br /> <br />STATUS: Reappraisal has been completed. Findings of the investigation show <br />that Federal development of the Higgins reservoir site is not warranted at the <br />present time. Existing sources of water supply are adequate for all projected <br />needs. An appraisal report dated November 1981 was released for public use. <br /> <br />DESCRIPTION: The Wilburton Project reappraisal was to reappraise the short- and <br />long-term M&I water supply needs of the project area (Pittsburg and Latimer <br />Counties, Oklahoma) and to reassess the capability of available water resources <br />to meet those needs. <br /> <br />67, Western U.S. Water Plan (Inactive) (See Arkansas River Basin Above <br />Keystone Dam) <br /> <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.