Laserfiche WebLink
<br />1588 <br /> <br />TABLE 8.2 RENTER REQUIREMENTS FOR 5,000 AF RENTER DEMAND WATER BANK <br /> Monthly User Transit Transit FLC HG FLC HG <br /> Distribution Demand Loss Loss Requirement Requirement <br /> (%) (AF) (%)(1) (AF)(I) (AF) (CFS) <br />MAR > 15 4.4% 219 0,54 1.2 220 7 <br />APR 8,2% 411 0.54 2.2 413 7 <br />MAY 8.5% 425 0.54 2.3 427 7 <br />JUN 8,2% 411 0.54 2.2 413 7 <br />JUL 8,5% 425 0.54 2.3 427 7 <br />AUG 8,5% 425 0.54 2.3 427 7 <br />SEP 8,2% 411 0.54 2,2 413 7 <br />OCT 8.5% 425 0,54 2.3 427 7 <br />NOV<=15 4.1% 205 0.54 1.1 207 7 <br />NOV > 15 4.1% 205 0.54 1.1 207 7 <br />DEC 8.5% 425 0.54 2.3 427 7 <br />IAN 8.5% 425 0.54 2.3 427 7 <br />FEB 7.7% 384 0.54 2,1 386 7 <br />MAR < =15 4.1% 205 0.54 1.1 207 7 <br />TOTAL 100% 5,000 27 5,027 <br /> <br />NOTES: <br />(1) COMPUTED TO RENTER'S POINT OF DIVERSION FROM THE MAIN HEADGATE. <br />THE lRANSIT LOSS IS VARIABLE, DEPENDENT UPON THE ANTECEDENT FLOW INTHE RIVER <br />AND OTHER CONDmONS. <br /> <br />8-18 <br />