My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02949
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:50 PM
Creation date
10/11/2006 11:27:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.44.A.1
Description
Green Mountain Reservoir
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1999
Author
CWCB
Title
Green Mountain Reservoir Historic Users Pool (HUP) Draft Operating Criteria
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e. Maximize power generation, while maintaining: <br /> <br />(I) Adequate storage to meet the anticipated requirements of Senate Document <br />No. 80 and the agreements: under the Stipulation' and Agreement oftlii! <br />Orchard Mesa Check Case.' <br /> <br />(2) A minimum power head, which is consistent with the integrated system power <br />operations. <br />2. Operation durin~ snowmelt period (April-July) <br />a. Bypass inflow, as required, to supply downstream vested rights. <br />b. Replace water withheld by the CBT Project, as required. <br /> <br />c. Make required releases for west slope natural flow irrigation and domestic water <br />users depletions. <br /> <br />d. RedUce releases from traditional levels before andafferthe peak flow enh'ancemee <br />for the Coordinated Reservoir Operations effort DUring:pelikflowenhancem,,:'! <br />release the lesser of inflows or turbine capacity (approx. lS00'cfS) for approxiinate1!l <br />a ten day period. <br /> <br />e. ~t!gatthe end()fJune,~avai!.~~intl!Il~Ff~ <br />~~(HUP),on;l11~~.iJt.co~.~~ <br />establiSHed under the settlement oftlr=Orc~Clreell~~, <br />'" '",-,---- """"""-",,,_'''_u,' ""'____-',"-__, <br /> <br />f. If'iltsurpltls conditionis-declilred in tlilltHUP;ri1li1re-rel~deragreement;ln. <br />Grand.Vitlley Power Plant to the lesser'ofthe amountof the:surplus or the capaci!I <br />ot:ith=€irand Valley Power plant ~11~,sy~()rthe am~neededfOgen~ <br />powen~llie Grand Valmy P'owedffliDlf' <br /> <br />g. Make required releases for contract water depletions. <br /> <br />h. Fill without spilling. <br /> <br />1. Maximize power operation consistent with I.e. <br /> <br />J. Make releases as outlined in the above referenced documents. <br /> <br />3. Operation after snowmelt period (AuiUSt-October) <br /> <br />a. Bypass inflow as required to supply downstream vested rights. <br /> <br />b. Replace water withheld by the CBT Project, as required. <br /> <br />filename: CBT A0P98,DFT <br /> <br />31 <br /> <br />P",liminary Working Draft July 8, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.