Laserfiche WebLink
<br />high runoff. September precipitation was li1l:1eh !!bo, ~ a"'emge at +85 percent of average over the <br />Project. <br /> <br />The maximum recorded temperature at Green Mountain Reservoir was 890F on lrttgtl:fl: lJ. The <br />maximum recorded temperature at Lake Granby was 820F on Attgl13t 12, and Lake Estes <br />recorded a maximum temperature of 84 or M Atlgll3t 12. The minimum recorded temperature <br />at Green Mountain Reservoir was 25 OF on r ,:bl t1M) 1. The minimum recorded temperature at <br />Lake Granby occurred on .htnl:ltll') 6 a.Jd "It! 280F, and Lake Estes recorded a minimum <br />temperature of 21 OF on rd'ltlll1} 2. <br /> <br />Alva B. Adams (Adams Tunnel) diversions totaled 208,499 acre-feet (9+ percent of average) for <br />the water year. <br /> <br />The Northern Colorado Water Conservancy District declared a quota of 59 percent (155,099 acre- <br />feet) for the allocation of Project water to allotment contract holders for water year 1998. The <br />carryover water program delivered 90,928 acre-feet to Project water users in water year 1998. <br /> <br />Seasonal water deliveries (November +995-0ctober -t9%) were 192,190 acre-feet, including <br />carryover water, and this was 83 percent of average. <br /> <br />Project generation for the water year was below average at 84 percent of average. <br /> <br />filename: CBT AoP98.DFT <br /> <br />3 <br /> <br />PIdimiDary Wortdng Draft July &; 1999 <br />