Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />TABLE I <br /> <br />SENIOR WATER RIGHTS CLAIMED BY GENESEE <br /> <br />BEAR CREEK LAKE OPERATION STUDY <br /> <br />APPROP. <br /> <br />AMOUNT <br />ORIGINAL CLAIMED <br />DIVERSION BY <br />ADJUD. RATE GENESEE <br /> <br />. <br /> <br />WATER RIGHT PRIORITY DATE DATE (cIs) (cIs) <br />Hodgson Ditch 3 6/01/1861 2/4/1884 8.2500 0.3094 <br />Warrior Ditch 4 12/01/1861 2/411884 12.3300 0.7629 <br />Pioneer-Union Ditch 5 12/1011861 2/411884 12.4100 0.6793 <br />PIoneer-Union Ditch 11 9/01/1862 2/4/1884 8.1300 0.4450 <br />Warrior Ditch 14 10/31/1864 2/4/1884 26.4700 1.6769 <br />Pioneer-Union Ditch 16 3/1511865 2/4/1884 25.1300 1.3757 <br />Warrior Ditch 16 4/01/1865 2/4/1884 11.4900 0.7110 <br /> <br />. <br /> <br />NOTES: <br />. Proposed for storage In Bear Creet Late. <br />