<br />..
<br />
<br />00,0.2 fH
<br />
<br />FUTURE USES
<br />
<br />Works Authorized or in Advanced Planning Stage
<br />
<br />Location
<br />
<br />Pro.iect
<br />
<br />Tribs. in Colorado
<br />
<br />San Juan-Chama;H~
<br />
<br />Pine River
<br />
<br />Pine River Ext. ;~
<br />
<br />San Juan-Animas
<br />San Juan above Pine R.
<br />San Juan Pine River to
<br />Animas
<br />It ' It
<br />II If
<br />
<br />Navajo Reservoir;H~
<br />Navajo Project;*
<br />Hammond*
<br />Frai tland;~
<br />Hogback Ext.",,'
<br />
<br />San Juan below Animas
<br />II II
<br />
<br />Animas.,.LaPlata
<br />
<br />Animas-LaPlata*l~
<br />
<br />From San Juan System
<br />
<br />C.R.S,P. Evaporation
<br />Authorized units
<br />
<br />Total
<br />
<br />Other Potential Uses
<br />
<br />110,000 Not evaluated
<br /> , "
<br />3,800 Not e.Yaluate4.
<br />-0- -0_
<br /> Not evaluate4
<br />508,000 252,300
<br />23,000 ....0...
<br />4,500 2,100
<br />49,000 22,600
<br />66,800 Not evaluate4
<br />-0-
<br />765,100
<br />
<br />Total Depletion
<br />Average
<br />A. F.
<br />
<br />/
<br />Total Diversions
<br />Average
<br />A. F.
<br />
<br />110,000
<br />1,400#
<br />
<br />_0_
<br />
<br />39,000 Y
<br />252,300
<br />6,800 ~
<br />2,100
<br />22,600
<br />
<br />33,400
<br />
<br />73,300Y
<br />
<br />540,900
<br />
<br />San Juan-Animas Town of Farmington $ 5,000 10,000
<br />San Juan be low Animas Utah Construction Co.$ 39,000 55,000
<br />Above Navajo Dam San Juan-Chama a 125,000 125,000
<br />Below NavajO Dam N&Ia 112,000 224.000
<br />" " " El Paso Natural Z 500 1.000
<br />" II II Bloomfield Irrig. Z 3,000 6,000
<br />II II II C,. H. Hallet Z 1,700 3,400
<br />Animas River ~ Ranchito Mutual Z 1,300 3,400
<br />II II Frank Nanzori z 400 1,.000
<br />II " f Wm.. Kottke Z 200 500
<br />" II l- N., H.. Englebreacht Z 100 250
<br />San Juan bel. Animas {- Utah Construction Co. Z 8,800 17,500
<br />II II II /. R., G. Ray Z 1,800 3,600
<br />
<br />Indian De_
<br />pletion
<br />AVF(.-A.F.
<br />
<br />..0-
<br />
<br />- ~.
<br />
<br />- ...
<br />
<br />- ~
<br />
<br />** Feasible projects as reported from present stat11s of planning.
<br />* Authorized projects, excluding main reservoirs,
<br /># Ma;y not all be used due to inundation of project lands by Navajo Reservoir.
<br />f, Part of Hammond Project Area included in Present Uses.
<br />$ Possible 11sage 11nder applications on file in good standing which have not received
<br />action. .', .
<br />a Possible alternative uses under U..S. Gov't filings; portions of both maybe develGpell...
<br />z Notices of Intention to Appropriate Water in good standing. .
<br />.j. Priority date later than N., M.. filing for Animas-LaPlata Project.
<br />Y U.S.D.I. Report "Financial and Economic Analysis, C.R...S.'p.," dated February 1958.
<br />
<br />"
<br />
<br />'t "
<br />',t
<br />
<br />" ,,_ ~ - -.4-'
<br />
|