Laserfiche WebLink
<br />Annual Report For 1974 <br /> <br />Month <br />April <br />May <br />June . <br />July . <br />August <br /> <br />NEE NO SHE RESERVOIR <br />1974 <br />CAMANCHE CANAL TO AMITY CANAL <br />Acre Feet <br />4,650 <br />11,925 <br />200 <br />. . . ............. 3,480 <br />50 <br /> <br />TOTALS <br /> <br />20,305 <br /> <br />PAWNEE CANAL FROM NEE SKAH RESERVOIR <br />Diversion to Fort Lyon Canal <br /> <br />Month <br />May <br />June . <br />July. <br />August <br /> <br />TOTAL ACRE FEET <br /> <br />Equipment Operations <br /> <br />The TD-IS Dozer is in excellent condition. <br /> <br />The 22-B Dragline is in lair condition. <br /> <br />Days <br />13 <br />31 <br />2 <br />31 <br />5 <br /> <br />82 <br /> <br />Acre Feet <br />1,488 <br />512 <br />1,703 <br />38 <br /> <br />3,741 <br /> <br />The Bantam Dragline has been overhauled and is in rair condition. <br /> <br />A new I yard bucket was purchased (or this machine during the year. <br /> <br />The A-C Motor Grader is still serviceable. <br /> <br />The lHe winch truck is in rair condition. <br /> <br />The lH<;: Diesel truck-tractor and low-boy are in good condition. <br /> <br />The 1/2 T. Chev. Pickup should be replaced. <br /> <br />The 2 T. Che.... truck should. be replaced. <br /> <br />Page 20 <br />