Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OO!318 <br /> <br />TABLE OF CONTENTS <br /> <br />1.0 Introduction. . <br /> <br />1 <br />2 <br />2 <br />5 <br /> <br />2.0 Soil Suitability <br /> <br />3.0 Land Clearing and Preparation. <br /> <br />4.0 Farm Efficiency Adjustments. <br /> <br />5.0 Results of Level B Analysis <br />for the Piedra Watershed <br /> <br />5 <br />9 <br /> <br />6.0 Conclusions. . . . . . . . . <br /> <br />APPENDIX A Estimation of Clearing and Grubbing Costs <br />APPENDIX B Revised Crop Budgets for the Piedra Watershed <br /> <br />LIST OF TABLES <br /> <br />Table 3-1 Estimated Canopy and Brush <br />Removal Costs by Land Category . . . . . . . . . . . . 4 <br /> <br />Table 5-1 Level B Economic Analysis <br />Piedra Watershed . . . . . . . . . . . . . . .. 7 <br /> <br />Table B-1 Net Returns Analysis for a 203 Acre <br />Operation in the Piedra Watershed <br />