My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02900
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:34 PM
Creation date
10/11/2006 11:26:13 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.08
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
10/1/1994
Author
Western Area Power A
Title
Glen Canyon Dam Interim Operations - Estimated Net Expense - April 1994 through Sepyember 1994
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />:1 <br /> <br />Each page within the packet contains: (1) a strip chart of real-time <br />Glen Canyon Dam operations during the ramping event, (2) a graph of the <br />USGS Lee's Ferry Gauge showing river elevation during the ramping event, <br />(3) a graph of hourly integrated Glen Canyon Dam generation during the <br />ramping event, and (4) a brief written explanation of the ramping event. <br /> <br />For the study period, 114 instances of deviations were found. Most of <br />the conditions were caused by more than one factor: (e.g., control area <br />regulation and imports/exports different than pre-schedule), therefore, <br />multiple variations can be explained by one anomaly. <br /> <br />The following table summarizes the causes and frequency of the 114 <br />deviations: <br /> <br />" <br /> <br />Primary Cause(s) of Deviation <br /> <br />Number <br />Of Instances <br /> <br />Percent <br />Of Events <br /> <br />,0 <br /> <br />Control Area Regulation <br />Control Area Disturbance <br />CRSP Resource Availability <br />Aspinall Operations <br />Flaming Gorge Operations <br />Imports/Exports Different than Pre-schedule <br />Other <br /> <br />49/114 <br />4/114 <br />17/114 <br />8/114 <br />1/114 <br />13/114 <br />22/114 <br /> <br />43 <br />4 <br />15 <br />7 <br />1 <br />11 <br />19 <br /> <br /><.:: <br />:t <br /> <br />f:: <br /> <br />v. <br /> <br />EXPENSES <br /> <br />i - ~ <br /> <br />A. Net Expense <br /> <br />r.': <br /> <br />The estimated net expense of interim releases for April through <br />September 1994 are summarized below: <br /> <br />Net Expense <br /> <br />April 1994 <br />May 1994 . <br />June 1994 . <br />July 1994 . <br />August 1994 , <br />September 1994 <br /> <br />$281,420 <br />$328,093 <br />$421,262 <br />$510,924 <br />$574,955 <br />$489,742 <br /> <br />o~ <br />> <br />~~ <br /> <br />...~- <br /> <br />Attached are Tables 1 through 6 detailing the net expense analysis <br />by component for April through September 1994. <br /> <br />'.::; <br /> <br />'. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.