My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02899
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02899
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:34 PM
Creation date
10/11/2006 11:26:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8102.100
Description
Arkansas River-Arkansas River Basin Basic Hydrology-Gaging Records
State
CO
Basin
Arkansas
Water Division
2
Date
8/1/1960
Author
Wallace Doe
Title
Results of Arkansas River Gaging Stations Investigation-August 1 2 and 3 1960
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />~ .-- <br /> <br />4. Construction of a gal!1ng l5ta~~(ln and. iMltal.1.At1on of 8 tiTelemark" <br />telemeter1ng devico-was recommended for installation just below <br /> <br /> <br />the Catlin Dam. Total estimated costs to be about $? ,000. To <br /> <br />thie recotmnendation was assigned priority ot need No.4. <br /> <br /> <br />5. Repairs and general rehcJ.bilitation of the existing gaging <br /> <br /> <br />stations at Canyon City, Salida and Granite were recommended <br /> <br /> <br />at a total estimated cost of about $7,500. To this recommendation <br /> <br />was assigned priority of need No.5. <br /> <br />6. Installation of radio or telephone te1emetering stations in all <br /> <br />present and proposed gaging stations on the Arkansas River. <br /> <br />7. Reactivation of tenner gaging stations, or construction ot new <br /> <br />gaging stations, as may be the case at the following locations: <br /> <br />a. Nyberg - south of Devine on the Arkansas River. <br /> <br />b. Pueblo - near Santa Fe Ave. bridge over Arkansas River. <br /> <br />c. Portland - just below old Highway 50 bridge across Arkansas <br />River. <br /> <br />d. Parkea.le - just sbove Highway 50 bridge across Arkansas River. <br /> <br />Coste and priorities for No. 6 and No. 7 are not now estimated or <br /> <br />recommended. Such coste and priorities will be assigned as need appear8, <br /> <br />or requests are made. <br /> <br />At the close of the meeting, and with the approval of those present <br /> <br />at that meeting, the above recommendations were read to D. E. Whitten, <br /> <br />State Engineer and Roy Burgess, State Hydrographer who indicated a <br /> <br />/ <br /> <br />wish to cooperate in the program to the limit of their authority and <br /> <br />budget. Present at this diacu.esion were Fit L. Sparka, Fred Boydston <br /> <br />and Wallace a. D:)e. <br /> <br />\, \h, ~ (,. " CI,.1).~, <br />Resident Engineer <br /> <br />2377 <br />
The URL can be used to link to this page
Your browser does not support the video tag.