My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02897
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:33 PM
Creation date
10/11/2006 11:26:01 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1978
Author
US DoI BoR
Title
Special Report Investigation of Review Issues Narrows Unit- Colorado Pick - Sloan Missouri Basin Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE OF CONTtNTS (continued) <br /> <br />CHAPTER II--(continued) <br />Ground-Water Recharge (continued) <br />Potential Problems. . . . . . <br />Recharge Site Selection. . <br />Operation and ~laintenance. <br />Water Quality. . . . . . . <br />Water Quality for Irrigation. <br />Cost Estimates. . . . . . . . <br />New Facilities. . . . . . <br />Rights-of-Way. . . . . . . . . . . . . . <br />Operation, Maintenance, and Replacement. <br />Total Costs. . . . . . <br />Onfarm Costs . . . . , <br />Power .. .. .. .. .. .. .. .. <br />Economic Analysis . . . , <br />Benefit Determination. . . . <br />Irrigation Benefits Analysis <br />Pumping Investment and Costs <br />Project Costs. . . . . <br />Benefit-Cost. Analysis. <br />Conclusions . . . . , . , <br />BIBLIOGRAPHY <br />APPENDED MATERIAL <br /> <br />. . <br /> <br />. <br /> <br />LIST OF TABLES <br /> <br />Page <br /> <br />46 <br />. 46 <br />47 <br />48 <br />48 <br />49 <br />49 <br />50 <br />50 <br />51 <br />51 <br />52 <br />52 <br />52 <br />52 <br />53 <br />53 <br />54 <br />55 <br /> <br /> <br />; <' . ~ ' <br /> <br />Number Ti He Page <br /> <br />1 Monthly streamflow changes, Pl atte Ri ver at <br /> <br />Ov.erton.. . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 32 <br />2 Number of Whooping Cranes seen in Nebraska <br />(1949-1977). . . . . . . . . . . . . . . . 35 <br />3 Recharge and conveyance facility requirements <br />for the four test areas. . . . . . . . . . . 43 <br />4 Recharge and conveyance facility requirements <br />for three recharge alternatives in the <br />. South Platte study area. . . . . . . . . . 45 <br />5 Total dissolved solids diverted to irrigated <br />lands below Narrows Dam site. . . . . . . 49 <br />6 Ground-water recharge systems, . . . . . . .. 51 <br />7 Benefit-cost analysis. . . . . . . . , . . . 54 <br />8 Comparison of ground-water alternative with <br /> <br />project. . . . . . . . . . . . . . . . . . 56 <br /> <br />iii <br /> <br />.. . <br />.. . <br />'.~" . .. . <br /> <br />:,::." <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.