My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02884
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:29 PM
Creation date
10/11/2006 11:24:47 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1987
Title
Poudre river Corridor Fishery Plan A guide For The Enhancement of the Poudre River Corridor
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />. <br /> <br />. <br /> <br />6.4 Phase III: Hydrological Analysis <br />Objective: ,To identify alternatives for providing selectedflo\1 regimes. <br /> <br />Scope of Work: <br /> <br />1, Analyze existing and possible future water 'storage, delivery, and <br />exchange practices affecting the Corridor. ' ' " ,'" <br /> <br />2. Identify alternatives within Institutlonal~and legal constraints <br />for augmenting in-stream flo\1s.' -" - -' - <br /> <br />3. Estimate costs of In-stream flo\1, alternatives. <br /> <br />6.5 Phase IV: Implementation <br /> <br />~,- ,- --'-- - . <br />- -,-,- <br /> <br />Object I ve: Select and impl ement alterriativesforlll1~rovlrig:waterqua 1 ity, <br />physical habitat, and flow regime.~"., "- <br /> <br />Scope of Work: <br /> <br />1. <br />greatest <br />manner. <br /> <br />Select alternatives defined in precedingpna~fes'wnichprovide the <br />enhanc€ment of fishery potent I all ri :themost 'cosFeffect i ve <br /> <br />2. Provide for institutional and legal actions, constt:'uction <br />contracts, and volunteer efforts necessary for Implementation. <br /> <br />3. Implement selected water quality,' habita.t,andflo\1 alternatives. <br /> <br />6.6 Phase V: Evaluation <br /> <br />Objective: To assess the effectiveness of Implemented alternatives In <br />enhancing the fishery in the Corridor. <br /> <br />Scope of Work: <br /> <br />1. Assess,the status of biological components in relation to \1ater <br />quality, habitat, and flow regime. <br /> <br />2. Recommend alterations as necessary. <br /> <br />7. FUNDING <br /> <br />Specific sources of funding are not identified in this plan, as it will be <br />the responsibility of the Coordinating Committee to identify and pursue a <br />variety of public and private sources of funding, It Is not yet possible <br />to Identify the costs of the various phases to the project that are <br />outlined. Some possible sources of funding are discussed here, and a list <br />of organizations which ar~ known to fund aspects of urban fishery projects <br />fo11o\1s. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.