Laserfiche WebLink
<br />0017J8 <br /> <br />wi'thearth'c:i:k8s-'9',5'~' feet tong. The outlet capac1t;r is 13,500 second- <br /> <br />feet and, the spillway capacity is 107,000 second-fe8t. The maximum <br /> <br />heir~t of the dam above thE stream bed will be 180 feet. The dam foun- <br /> <br />dation will be constructed on Dakota sandstone, which ia known to reach <br /> <br />a depth of 215 feet at thin site. Abutments of the dam would be <br /> <br />imbedded in the ~f..t Grar.eros and Carlile shal8s which are consiclered <br /> <br />impervious. <br /> <br />Wi th the high->Iater line at elevation 4,902 feet the reservoir <br /> <br />would have a capacity of 400,000 acre-feet and would flood 6,700 acres. <br /> <br />It would bs n8cessary to r810cate about 20 miles of the Denver and Rio <br /> <br />Grande Railroad and about 6 miles of Colorado Highway No. 96. <br /> <br />ThQ. total estimated cost of the Pueblo Dam and R8servoir is <br /> <br />$4l,122,OOO . <br /> <br />Pueblo PowernlMt <br /> <br />The Pueblo Powerplant would be located at the foot of the PueblO <br /> <br />Reservoir about 6 mi18" Ifflst of Pueblo. The averaee head on the turbines <br /> <br />would be 113 feet. <br /> <br />The cost of the pO>lerplant and appUl.ten~t structures is estimated <br /> <br />to be $ .:\, ~;- " v.' t\ <br /> <br />1'1\ ...,) <br />ii..L-e-...., ~-1'. ~:;.4...... t.:~ . Vi <br />,(l " '~""". <br />._{ ':~.I"'..'. 'r~.' ~~.' <br /> <br />..:..... <br /> <br />Summary of costs <br /> <br />The total construction cost of the Initial Development is esti- <br /> <br />mated to be $133,142,000, and the annual cost.s, $ J. l'1 r "'J" ,as <br /> <br />summarized in the following te.bulation: <br /> <br />48 <br />