Laserfiche WebLink
<br />I~ <br /> <br />J <br /> <br />OD17j4 <br /> <br />Princeton-Johnson Power Canal <br /> <br />From the Princeton Powerplant a 750 second-foot uhlined canal <br /> <br />would carry the water S011theast>lard a distance of 7 milea to a forebay <br /> <br />1.2 miles above the Johneon Powerplant. The foreb~ would hav~ a <br /> <br />cepacity of 200 acre-feet and would provide storaFe for power peaking. <br />gection <br />The canal!1.2,milee in length from the foretay to the Johnson Power- <br /> <br />plrolt would have a capacity of 1,000 second-feet and would be concrete <br /> <br />lined. <br /> <br />The estimated cost of the Princeton-Johnson Power Canal, including <br /> <br />$415.000 for the forebay, ie $1,465,000. <br /> <br />\ <br /> <br />Johnson Powerolant <br /> <br />The Johnson Powerplcnt >Iould be'located about 11 miles north of <br /> <br />Salida on U. S. High"~ No. ~85 at Threemile Creek. A pC~Etock 2,500 <br /> <br />feet long >Iould connect the canal and the powerplant. The head on the <br />~,~ <br />turbines would be of ~ feet. <br /> <br />v7 <br /> <br />\ <br /> <br />f <br />