Laserfiche WebLink
<br />001655 <br /> <br />(j) The project and all of its features shall be <br />operated in a maDI18r determined by the Secretary of the <br />Interior as neceseary to provide a.t the junctiOIl of the <br />. <br /> <br />North Fork of tile Fryingpan River aBi the main stem of the <br />Fryingpa.n River, a flow of 30 second-feet or the natural <br />flo..... whichever is less; to insure an adequate suPP1J' for <br />irrigation in tlle vicinity of Cameo OIl the Colorado River <br />in proportion: to the Fryingpan-Arkansas DiversionJ and <br />to provide a sufficient water suppJ,y for sanitary purposes, <br /> <br />for the preserva.tion of scenic attractions. ani for the <br /> <br />preservation of fish 'life. The determination of the need <br /> <br />for and the amount and times of release of water from ~spen <br /> <br />Heservoir for replacement purposes shall be made by tile <br /> <br /> <br />Secretary of the Interior whose findings shall be final. <br /> <br />In order to facilitate compliance with the stipulation in <br />pa.ragraph (j) hereof, a representative may be selected and <br />designated by the interesta dependent !hereon in Pitldn and <br />Garfield Counties, Colorado. and when so designated he lIill <br />be recogDized as the official spokesman of said interests <br />in all matters dealing with project operations affecting <br />Pitkin and Garfield Counties. <br />The prinCiples and provisions expressed in these stipulations have <br />been approved by the <br /> <br />representing interests <br /> <br />in western Colorado. <br /> <br />9 <br />