Laserfiche WebLink
<br />.' <br /> <br />DEC-17-2001 11: 47 <br /> <br />P.03 <br /> <br />9. P.lS, Fishing: The liu:t that outfittets had elcd or not booked trips during the week of the <br />test, as a result of!!l.mI com:ems, does not app to be a valid means of addressing impacts of <br />the low flow test or any long term. change. Th outfitters, nol lheir clients, made these decisions. <br />Table 2, which compares angler hours, does n provide:my way to actually compare the angler <br />hours during the low flow test with the 0 data presented in the table. and is therefore <br />Ill....ni"gless, if not misleading. <br /> <br />1 O. Hpdroptnl'U, polO: The discussion only ferences the crosion of the l"ouIi"g edge of the <br />turbine blades. It does not indicate poten' long term impacts of power rcdw:tion on <br />FarmingtoIL In the discussion of impacts on ther resources, long term impacts are discussed. <br />Those impacts should be discussed in this secti n as welL <br /> <br />11. P.21, Other raourr:n1tlMt1S of interesr. <br />assets (IT As) should be discussed in this repo <br /> <br />impacts or potential impacts in Indian Trust <br /> <br />and in the draft ElS. <br /> <br />12. P.ll, Wht1I the raults IIWIIII: The I" p h indicates that this discussion includes "an <br />infonnal snmmAry of test findings and 10 t 'ections for affected re urces." However, <br />the long term projections are not discussed 10 hydropower. The discussion is limited to "slight <br />damage to turbinc blades" and 'iUrthcr damag would be cxpected if flows below 350 cfs." No <br />mention is made of the long term impact ofre uced hydropower generation and lost revenues by <br />the City of Farmington. This should be incl ed in the discussion and rerereuccd in this table. <br />As mentioned above, there should be a discu ion of Tndian trust assets. Regarding ITAs, thc <br />table simply says "outside the scope of the les .. whil:h is not accurate. <br /> <br />13. P.24, TIu! tWd sup: The dates in this sect n should be revised bascd on the latest projection <br />of actual completion dates fur various items re ated to the draft and final EIS. <br /> <br />008:18 <br />TOTAL P. 03 <br />