My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02818
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:03 PM
Creation date
10/11/2006 11:22:28 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Colorado Mainstem
Date
7/1/1948
Author
Metro Water District
Title
Metropolitan Water District of Southern California - Tenth Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />, <br />I. <br />I <br />~! <br /> <br />i <br /> <br />I <br />I. <br />r <br /> <br />I <br />I <br />l! <br />r <br /> <br />l <br /> <br />.\ <br />~ <br /> <br />,'" !A'-l~") <br />........; <br /> <br />OPERATIO"l AND MAINTENA"ICE <br /> <br />, ~, 39 <br /> <br />. <br /> <br />only minor interruptions. A survey of plant equipment by Bechtel <br />Corporation was started in preparation for the proposed change <br />from 50 to 60 cycle power by the Southern California Edison Com- <br />pany. Due to required shutoffs of natural gas for industrial service <br />at times of heavy domestic demalld in cold periods. it was necessary <br />to challge over to fuel oil for the carbon dioxide boiler for a total <br />of 27 days during the year. <br />On January 16, 194~ all bids received for construction of the tirst <br />expansion of the water softening alld tiltration plant were opened_ <br />The cOlltract for this work was awarded to the L. E- Dixon Com- <br />pany on January 23, 1948. Cleaning of the construction area was <br />started Oll February 11 and excavation Oll February 16. Since the <br />softening plallt was origillally desiglled with provisions included for <br />increased capacity through future plant expansion. 110 interference <br />with plant operation has so far resulted from the construction pro- <br />gram_ <br />Following the reopening of the plant to visitors ill June 1946, <br />many hUlldreds of individuals, as well as student and industrial <br />groups, clubs and civic organizations, have taken advantage of this <br />service to the public. The number of visitors to the plant during the <br />tiscal year exceeded 2200 persons_ <br /> <br />Chemicals for plant operation <br /> <br />A total of 915 carloads of chemicals was delivered to and unloaded <br />at the softening plallt for use in the softening process_ The difficulty <br />in procuring lime had eased to the extent that bids could be obtained <br />and a one-year contract awarded for delivery of this chemical in <br />sufficient quantity to meet plant requirements_ The cost was approx- <br />imately three times the cost under the original tive-year contract. <br />Alum was found to be in short supply and difficulties were expe- <br />rienced on several occasions in obtaining delivery in time to meet <br />plant needs_ <br />The need for soda ash was very limited alld 110 purchases of this <br />chemical were required durillg the tiscal year. <br />Deliveries of sodium chloride necessary for regeneration of the <br />zeolite softeners were contillued under the three-year contract <br />awarded during the preceding tiscal year. <br /> <br />Zeolite investigations <br /> <br />Observation and allalysis of softener unit operation and zeolite <br />efficiellcy were continued with the purpose of increasing the useful <br />life of the exchange mineral and decreasing salt consumption_ 80- <br />
The URL can be used to link to this page
Your browser does not support the video tag.