Laserfiche WebLink
<br />PROJ.# LEAD ACTIVITY 95 BUDGET RIPRAP FUND <br /> DATE SOURCE <br />18 CO Monitor Upper Colorado River fish community; develop 22.0 94- ann <br /> management action plan; make recommendation for 12/95 <br /> razorback and sQuawfish auomentation <br /> NPS Determine sQuawfish larval drift into Lake Powell 94-95 NPS <br /> . . . .. <br /> .CAPITAL PROJECTS: <br /> FLOODED BOTTOMLAND RESTORATION <br />*CAP-6 BR/FWS/UT/CO Implement conceptual flooded bottomland restoration 900.0 CAP <br /> management plans for Escalante Ranch (Green R.), Old <br /> Charlie Wash (Green R.), Scott Matheson site (Colo. <br /> R.), 15-Mile Reach site (Color R.), and Escalante <br /> State Wildlife Area (Gunn. R.) or other priority areas <br /> determined through the flooded bottomland inventory. 94-- <br /> Specific activities include: <br /> a. Monitor and evaluate success of Old Charlie Wash <br /> flooded bottomland restoration <br /> b. Green River Escalante flooded bottomland site - <br /> activities depend on outcome of FY 94 contaminant 95-4/98 <br /> studies <br /> c. Begin construction to restore flooded bottomland 9/95 <br /> habitat at Scott Matheson site <br /> d. Gain access at Gunnison River Escalante State <br /> Wildlife Area flooded bottomland restoration site <br /> HATCHERY <br />*CAP-2, Ouray, Craig, and Wahweap design and construction 200.0 CAP <br />*CAP-7 activities <br /> FISH PASSAGE <br />*CAP-4 BR/FWS Begin construction of passage at Redlands diversion 628.0 95- CAP <br /> Dam (BCl 10/96 <br />*CAP-5 BR BeClin construction of oassaoe at Price Stubb 50.0 94-9/96 CAP <br />*CAP-I0 BR/FWS Make recommendations for fish passage during low flows 200.0 94-95 CAP <br /> at agricultural diversions on the Yampa River <br /> Beqin restorinq passaqe 95-98 <br /> <br />. <br /> <br />. <br /> <br />4 <br />