My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02794
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:57 PM
Creation date
10/11/2006 11:21:06 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.500
Description
Colorado River Basin Salinity Control - Colo Dept of Public Health - WQCC and WQCD
Basin
Colorado Mainstem
Water Division
5
Date
5/17/1990
Author
Tom Roberts
Title
An Interagency - Interdisciplinary Approach to Watershed Planning
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />allocation of money, or !i:!,t_~9~~~~~!c_~:a;:,s'J;".iesi"':Q;. <br />Pk~j~~t~. This completed the first phase of the project. <br />~. ;,>'j;.JI-"'.$'i,.u,-_. <br /> <br />~, <br />~~ <br />~~, <br />Q.A <br /> <br />As I indicated at the beginning of this discussion, our first <br /> <br />charge was to rate the 219 watersheds in the Utah part of the <br />Colorado River Basin. Our next charge was to visit seven of the <br /> <br />watersheds as selected by the cooperating agencies and evaluate <br /> <br />them on a watershed basis. The seven watersheds were chosen on a <br />basis of their total score, ,s,,""f"~':'"ifngiit 7'~~;X'ci5:t~ <br />..,~~~;r ."""'~"~-<I<~ii,;.<,..~~"R->..""",. .~,;..,.~,\". <br /> <br />and local SCS or BLM concerns. As discussed above, the Project is <br />Interagency and interdisciplinary in nature. Not only are th~1 <br /> <br />t. ~_~"itF~r~~ <br />.~:w.. .! .,"'. . <. -: ..", "'... '.c;;:!lli.:f;.;,",."..",~ '0. '~"':~'<oti;;i..'" <br /> <br />'~_F'..:r~l!~.~ This <br />p . , ... .. ~-p"" _",~,__,",..<,*!'f <br /> <br />avoids much of the perception of "outside, experts" advising the <br /> <br />local agency staff on how to manage their resources. On a typical <br /> <br />watershed, we made arrangements to meet with and spend a week with <br /> <br />the local BLM and SCS personnel. <br /> <br />The first day ~was spent <br /> <br />explaining the project, process which is used, how and why we got <br />to their office and how the remainder of the week will be used. <br />I/".c./c. <br />The next few days ~ spent in driving or hiking over much of the <br /> <br />watershed, in company with the local range conservationists, <br /> <br />wildlife biologist, and occasionally the area manager. <br /> <br />The P~--'-~-~~~~i;X:~~~t::'" <br />. --~.,~ ;:::~.............""..." ,""'''-~-':Y <br /> <br />~(1968) ~used to estimate sediment yield and the watershed <br />w&;:. <br />~ evaluated on a hydrologic-geomorphic unit basis. On this basis <br /> <br />the watershed I s benches, valley floors, alluvial fans" and other <br /> <br />,. <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.