My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02781
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:53 PM
Creation date
10/11/2006 11:20:54 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.12
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
10/14/1997
Title
Annual Operating Plan for Colorado River Reservoirs - 1998
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~'I <br />'9 <br />l! <br />, <br />, <br />" <br /> <br />',". <br /> <br />For water year 1998 operations, Blue Mesa Reservoir will be drawn down to at least an <br />elevation of2283 meters (7490 feet) by December 31, 1997, in order to minimize 'icing problems <br />in the Gunnison River. Blue Mesa will continue to be drawn down through April 1998 to a level <br />that will accommodate the current most probable inflow scenario and accomplish the release <br />objectives with minimal power plant bypasses at Crystal. <br /> <br />~, <br /> <br />The minimum release objective of the Aspinall Unit is to meet the delivery requirements of the <br />Uncompahgre Valley Project and to keep a minimum of8,5 cms (300 cfs) flowing through the <br />Black Canyon of the Gunnison National Monument and to maintain a minimum of8,5 cms (300 <br />cfs) below the diversion structure at Redlands (at the confluence of the Gunnison and Colorado <br />Rivers) during the summer months, Under all three inflow scenarios, Blue Mesa is expected to <br />fill in the summer of 1998 and flows through the Black Canyon of the Gunnison National <br />Monument are expected to be above the minimum release objective during the summer months, <br />Filling of the reservoir in water year 1998 will ensure that reasonable specific releases required <br />to study the protection and improvement of habitat for endangered fish can be accommodated, <br />The forecasted runoff for the spring of 1998 will be closely monitored to achieve these <br />objectives, To protect both the blue ribbon trout fishery in the Black Canyon and recreation <br />potential, releases during 1998 will be planned to minimize large fluctuations in the daily and <br />monthly flows in the Gunnison River below the Uncompahgre Tunnel Diversion, <br /> <br />:i; <br /> <br />.t:~ <br /> <br />~~; <br /> <br />~-.;.. <br />'.1 <br /> <br />.,' <br /> <br />Navajo Reservoir <br /> <br />The April through July unregulated inflow into Navajo Reservoir in water year 1997 was <br />1,026 MCM (0,832 MAP) or 123 percent of average, Water year 1997 unregulated inflow was <br />1,530 MCM (1.240 MAF)or 123 percent of average, Navajo Reservoir did not fill in1997, <br /> <br />r~ <br /> <br />f:< <br /> <br />Section 7 consultation with the Fish and Wildlife Service on the operation of Navajo Dam <br />continued in 1997, Water year 1997 was the seventh year of a seven'year study to evaluate <br />alternative operations of Navajo Reservoir to benefit endangered fish, In an attempt to monitor <br />the aquatic impact oflow winter flows on the San Juan River, winter releases were restricted to <br />250 cfs during the November - February period, During the spring large releases of up to 140 <br />cms (5,000 cfs) were made during June and July to coincide with the peak flows of the Animas <br />River, This resulted in peak flows of305 cms (10,800 cfs) at Bluff, Utah, After the completion <br />of the large spring releases, releases were gradually reduced to approximately 17 cms (600 cfs) <br />for the remainder of the year, <br /> <br />~:. <br /> <br />~- <br /> <br />~~/ <br />~* <br /> <br />>.''-; <br /> <br />".'. <br />~.", <br /> <br />;('.- <br />">:;. <br />,.~'-;; <br />~ <br />~} <br />i~;.~ <br /> <br />In water year 1998, Navajo Reservoir is expected to nearly fill only under the probable <br />maximum inflow scenario, The reservoir should fill above 80 percent of full under the most <br />probable and probable minimum scenarios, Releases from the reservoir will be held near 17 cms <br />(600 cfs) through the fall and winter months and large releases will likely be made in May and <br />June in order to improve the habitat and provide better spawning conditions for endangered fish <br />in the San Juan River, <br /> <br />r.\.: <br /> <br />September 3, 1997 <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.