Laserfiche WebLink
<br />.' <br /> <br />co <br />m <br />.-of <br />...-1 <br /> <br />IRRIGATIO~: (Continued) <br /> <br />Water Supply <br />Diversion requirement <br />Lateral delivery requirement <br />Consumptive use requirement <br />Farm headgate delivery <br />Irrigation efficiency <br />Type of irrigation <br /> <br />(acre-feet/acre) <br />(acre-feet/ ac re) <br />(acre-feet/acre) <br />(acre-feet/acre) <br />(percent) <br /> <br />contour <br /> <br />Recommended farm size (acres) <br />Recommended water charge per acre <br />Recommended water charge per acre-foot <br />At lateral delivery point <br />At farm headgate <br /> <br />Class 2 <br />345 <br />$6.60 <br /> <br />$2.15 <br />$2.60 <br /> <br />Growing conditions <br />Average growing season. (days) <br />Average frost-free period (days) . <br />Elevation of project lands (feet above sea level) <br />Average annual precipitation (inches) (1940-68) <br /> <br />RECREATION: <br /> <br />3.23 <br />3.06 <br />1.02 <br />2.55 <br />40 <br />flooding <br /> <br />Class 3 <br />410 <br />$5 .15 <br /> <br />$1.70 <br />$2.00 <br /> <br />.. .110 <br />86 <br />6,100-6,750 <br />12.56 <br /> <br />It is anticipated that recreation facilities will be const~ucted <br />at both reservoir sites. The recreational facilities, costs, and <br />benefits will be evaluated by the National Park Service. <br /> <br />FISH AND WILDLIFE: <br /> <br />The Bureau of Sport Fisheries and Wildlife will evaluate the fish <br />and wildlife aspects of the project. The amount of enhancement or <br />mitigation measures made possible or required by construction of the <br />project is dependent on their report, however it is anticipated that <br />fishing benefits will occur at both reservoirs and along Savery Creek <br />below the reservoir. <br />