Laserfiche WebLink
<br />-' <br /> <br />m <br /> <br />n 32538 <br /> <br />US Army Corps <br />of Engineers <br /> <br />Public Notice <br /> <br />Sacramento District <br />1325 J Street <br />Sacramento, CA 95814-2922 <br /> <br />Public Notice Number: 200375243 <br />Date: November 7,2003 <br />Comments Due: December 8, 2003 <br /> <br />In reply, please refer to the Public Notice Number <br /> <br />TO WHOM IT MAY CONCERN: <br /> <br />SUBJECT: Application for a Department of the Army pennit under authority of Section 404 of the <br />Clean Waler Acl (CW A) and for waler quality certificalion under Seclion 40 I of the CW A to discharge <br />fill and dredged material within Long Hollow Creek and Government Draw, as shown in the attached <br />drawmgs. <br /> <br />APPLICANT: <br /> <br />La Plata Water Conservancy District <br />Attn: Mr. Brice Lee <br />940 C.R, 119 <br />Hesperus, CO 81326- <br /> <br />LOCATION: The project is located at Ihe confluence of Long Hollow Creek and Government Draw, <br />south of Red Mesa, La Plata County, Colorado (Seclions 29, 32, and 33, Township 33 North, Range 13 <br />West) <br /> <br />PURPOSE: The applicant's purpose for the proposed project is to satisfy the 1922 La Plata River <br />Compact between the states of Colorado and New Mexico, <br /> <br />PROJECT DESCRIPTION: The La Plata Water Conservancy District (LPWCD) has applied for a <br />Deparlment of the Army permit to construct an on-channel reservoir in Long Hollow, a tributary to the La <br />Plata River. This facilily would allow Colorado to deliver water to New Mexico, as stated in the 1922 La <br />Plata River Compact. The dam embankment would be located approximately 0,5 mile upstream of the <br />confluence of Long Hollow and the La Plata River, approximately 4 miles upstream of the Colorado,New <br />Mexico slate line (see Figure I), <br /> <br />The facllity will capture flows from 43 square miles of the Long Hollow and Govemment Draw <br />watersheds. The intent is to capture perennial flows supplied by groundwater irrigation relurn flows from <br />and precipitation on Red Mesa, The dam embankment will be constructed from on-site materials, The <br />dam embankmenlls shown in Figure 4, The embankment cross-section is shown in Figure 2. <br /> <br />As proposed, Long Hollow Reservoir would have a maximum pool of 5,432 acre-feet (AF), inundate <br />approximately 160 acres, and extend 3.5 miles upslream. The reservoir pool will fluctuate dramatically <br />from year to year and season to season. The reservoir is expected to reach capacity about 50 percent of <br />the time, Most years, the reservoir will be drained entirely between April and July to help meet <br />Colorado's Compact obligation. Some years, there will be carry-over storage of500 to 2,500 AF. <br /> <br />The LPWCD will operate the reservoir. The reservoir typically will store water during non-Compact <br />times (December 1st - February 15th) and other periods when water rights for the reservoir are in,priority, <br />