Laserfiche WebLink
<br />^. ~. 1 "., <br /> <br />'n~ <br /> <br /> <br /> <br />'. '" {;~'l'''''':''~ ~'! " <br />-, ''i: ,';:,,~. '-' "~~if'~ <br />, Ii' l.'i't'l 4.;1.iy, ~~A~ <br />Huge radial sprinkler system <11 SeecJskadee <br />Development Farm <br /> <br />and more efficient water delivery and <br />savings over previous plans. The remaining <br />laterals and canals will be lined as a <br />reduced-scale McElmo Creek Unit. Legis- <br />lation authorizing construction of this unit <br />was passed in October 1 984. A Regional <br />Director's Planning Report! Draft Environ- <br />mental Impact Statement is expected to <br />be completed in Fiscal Year 1985. <br />Meeker Dome Unit: <br /> <br />A preliminary findings reporf on the Meeker <br />Dome Unit was completed in February 1984. <br />The findings Indicate the plugging of three <br />abandoned oil wells has significantly <br />reduced salf loading In the White River. A <br />piannlng report is scheduled for May 1985 <br />which will verrfy Ihese salinity reductions <br />through recent moniloring. The study will <br />be concluded: however, the planning report <br />and the data will be preserved in the event <br />any further studies are deemed necessary. <br />Price-San Rafael Rivers Unit: <br /> <br />A professional services contractor com- <br />pleted the identification of alternative <br />plans and Reclamation selected a recom- <br /> <br />I <br />. <br /> <br />~' . <br />./' ''T <br />. / :'t.,#!, ,f>,. <br />Dr "W...'.f.",.. ..~.a."...~.. <br />r -~~s: . .' <br />,,~;' ;"":;'\- <br /> <br /> <br />Agriculture in Weber Basin <br /> <br />mended plan, which consists of lining <br />stock ponds and extending municipal <br />systems to improve winter watering prac- <br />tices. The study is proposed for completion <br />In September 1985. Advance planning is <br />proposed to begin in Fiscal Year 1987. <br /> <br />Reclamation and USDA continue to coordi- <br />nate planning efforts. USDA planning efforts <br />are focusing on onfarm systems improve- <br />ments, some replacement canal and lateral <br />structures, and providing onfarm water <br />management assistance. The USDA on- <br />farm report was scheduled for completion <br />in Fiscal Year 1984. <br />Uinta Basin Unit: <br /> <br />The preferred plan consists of lining abouf <br />55.5 miles of canals and laterals and is <br />estimated to reduce salt loading by about <br /> <br /> <br />r;t:Jii... .J.. +""ll- <br />'.. ~>. >" <br />,,",'. .~ N~" . """7.",(W;:'."'" <br />"''' .-_."$7."_."'..... -,., .-....... <br />....'''.~-..:a~' J <br />.. <br /> <br />Farms in the Uinta Basin use water from the CUP <br /> <br />26,100 tons annually. This portion of the <br />study is scheduled for completion in Fiscal <br />Year 1985. The final portion of the study <br />will address the Indian and non-Indian irri- <br />gation distribution systems not considered <br />in the first portion and the potential for the <br />collection and industrial use of saline water. <br />Studies are scheduled to be completed in <br />Fiscal Year 1990, <br /> <br />Coordination between Reclamation and <br />USDA has been maintained in the progress <br />of this study. USDA is continuing its onfarm <br />Impiementation program and its work on a <br />number of lateral and onfarm improve- <br />ments, <br /> <br />13 <br />