My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02745
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:41 PM
Creation date
10/11/2006 11:19:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1984
Author
USDOI
Title
28th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Salinity Control <br /> <br /> <br />~ <br />LIIW19 canalS I<.H.!tJS IliJlrmul ill,ner:IISOlJl ollfflqation water <br /> <br />Progress is continuing on three ot the four <br />autl10rlzed units under the Salinity Control <br />Project (Paradox, Grand Valley, Las Vegas <br />Wash) The accomplishments in Fiscal Year <br />1984 are as follows <br />Units Authorized For Construction <br />Paradox Valley Unit: Deep well injection <br />stili appears the most cost-ettective solu- <br />tion for disposal ot collected brines, Contract <br />work is underway to identily a new injection <br />well site in a sl1allower receiving lormalion <br />with the objective 01 drrlllng and testing a <br />well Two independent contracts were <br />selected lor geophysical data interpretation <br />Theil task is to Identity the best location for <br />a lest well trom the geophysical data that <br />Reclamation has obtained, A contractor <br />has also been selected 10 design and over- <br />see construction of the test injection well, <br /> <br />The current deep well site selection pro- <br />cess has delayed the well drilling contract <br />award, A potential Injection well sile loca- <br />tion has been selected and property pur- <br />chased for It. <br />Grand Valley Unit: <br /> <br />Data collectron lor the Stage Two area Is <br />continUing DeSign data collection is under- <br /> <br /> <br />Alkali Slowly enCrOi1chinq c] fiH!Tlers alfallil fi('ld <br /> <br />way on the West End Government Highline <br />Canal and Laterals, the first facilities sched- <br />uled for construction under Stage Two, <br /> <br />The recommended plan includes piping <br />laterals and rnembrane lining the West <br />End, Middle Portion, and East End of the <br />Government Highllne Canal, Lining of the <br />middle and east portions of the Government <br />Highline Canal would be deferred until <br />needed to meet salinity goals, Completion <br />of the Draft Environmental Impact State- <br />ment is scheduled for the fall of 1985, <br />Las Vegas Wash Unit: <br /> <br />A contract was awarded to construct the <br />3,5-mile Pittman bypass pipeline with the <br />completion date set for November 28, 1984, <br />The curtailment ot seepage from the un- <br />lined ditches is expected to cause a rapid <br />drop in ground water levels in the Pittman <br />area, resulting in reduced loading of 8,000 <br />tons per year to Las Vegas Wash, Monitor- <br />ing of the resulting ground water changes <br />is expected to continue through Fiscal Year <br />1987 when an assessment will be made of <br />the results of the Pittman Verrfication Pro- <br />gram, <br /> <br />Another strategy to further reduce salinity <br /> <br />,c; <br />f'i ,,' <br />;'0,'(1., .~ <br />~{~-~' <br />;:'$",' ',,~ <br />"';'''';-' ">T:,'. <br /> <br />loading is using ground water barriers in <br />other areas of the Wash, Continued close <br />coordination with local interests will be <br />necessary to gain support on further plans <br />for salinity control, wastewater treatment, <br />wetlands park, and recreation land use, A <br />verrficalion effort has been proposed to <br />test the effectiveness ot the ground water <br />bamer concept with a monitoring program, <br />Crystal Geyser Unit: <br />The Crystal Geyser Unit has been deferred <br />indetinitely because of low cost eftective- <br />ness <br />Units Authorized For Planning <br />The ten units authorized for planning under <br />the Colorado River Water Quality Improve- <br />ment Program are at various stages within <br />the planning process as follows: <br />Big Sandy River Unit: <br />The preferred plan would remove saline <br />water by collection wells in the spring and <br />seep area of the Big Sandy River and would <br />pump the water through pipeline to a pro- <br />posed industrial use near Rock Springs, <br />WY, Chevron and Texasgult have informed <br />Reclamation that they no longer need fhe <br />amount of water originally determined <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.