Laserfiche WebLink
<br />1 <br />I <br /> <br />i0 <br />00 <br />{..... <br />C") <br />C) <br />C <br /> <br />STORAGE IN RESERVOIRS <br /> <br />49 <br /> <br />Reservoirs in Rio Grande Basin in New Mexico <br /> <br />Nichols Reservoir.--Water-stage recorder in E~~E~ sec. 21, r. 17 N., R. 10 E., on Santa Fe <br />RIver. Completed in 1942; capacity, 685 acre-ft. Water is for municipal use in Santa Fe. <br /> <br />h <br /> <br />h <br /> <br />h <br /> <br /> Mont -end gage e1g. t 'n eet and contents 'n acre-feet <br />Month Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Cal.yr. <br />Gage height 150.1 154.5 162.4 167.8 167.8 167.6 167.5 158.8 158.0 159.0 160.5 159.6 - <br />Contents 281 365 555 710 710 704 701 463 444 468 504 482 - <br />Change -73 +84 +190 -+155 0 -6 -3 -238 -19 +24 +36 -22 +128 <br /> <br />f <br /> <br />Cochiti Lake.--Water~stage recorder and manometer in SW~SW~ sec. 5, T. 16 N., R. 6 E., in <br />Pueblo de Cochiti Grant. on right bank. Cochiti Dam scheduled for completion in 1975; <br />capacity 498,100 acr.e-ft at elevation 5,450.0 ft (crest of service spillway); dead <br />storage 2,215 acre-ft at elevation 5,255.0 ft. Reservoir is operated by Corps of Engineers <br />for flood control and sediment storage. Storage began Nov. 12, 1973. <br /> <br />Month-end elevation in feet and contents in acre~feet <br /> <br />Date Elevation Contents Change in Contents <br />October 31 - 0 - <br />November 30 5,265.22 5.330 +5.330 <br />December 31 5.266.38 5,770 +440 <br />Calendar year 1973 - - +5.770 <br /> <br />Ga1isteo Reservoir.--Water~stage recorder and manometer in NW~ sec. 9, T. 14 N., R. 7 E., at <br />dam on Gal~steo Creek. Storage records begin in October 1970. Capacity 89,800 acre-ft <br />at elevation 5,608.0 ft (crest of spillway). Reservoir is operated by Corps of Engineers <br />for flood control and sediment storage. There was no storage at tHe end of each month <br />during the calendar year. <br /> <br />San Gre~orio Reservoir.--Staff gage in SW~NE~ sec. 20, T. 21 N.. R. 1 E. (projected), on Clear <br />Cree tr1butary to Rio Las Vacas and Jemez River. Completed in October 1958; capacity, <br />254 acre-ft at elevation 9,408.0 ft (crest of spillway). <br /> <br />Month end contents in acre feet <br /> <br /> - - <br />Month Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. No". Dec. Cal. yr . <br />Contents 160 180 220 260 320 270 220 170 140 120 140 160 - <br />Change +20 +20 +40 +40 +60 .50 -50 -50 -30 -20 +20 +20 +20 <br /> <br />Jemez can~on Reservoir.--Water-stage recorder in SW~SW~ sec. 32. T. 14 N., R. 4 E.. on Jemez <br />R1ver .3 m~les above mouth. Completed in 1953; capacity, 181,800 acre-ft at elevation <br />of 5.252.3 ft. Capacity at elevation 5,232.0 ft (crest of spillway), 112,600 acre-ft by <br />1969 survey. Reservoir is operated by Corps of Engineers for flood control and sediment <br />storage. <br /> <br />Month end elevation in feet and contents in acre feet <br /> <br /> - - <br /> Date Elevation Contents Change in Contents <br />December 31, 1972 - 0 - <br />January 31, 1973 - 0 0 <br />February 28 - 0 0 <br />March 31 - 0 0 <br />April 30 5,170.85 7,920 +7,920 <br />May 31 5,185.55 21,420 +13,500 <br />June 30 5,142.20 32 -21,388 <br />July 31 5,139.85 15 -17 <br />August 31 - 0 -15 <br />September 30 - 0 0 <br />October 31 - 0 0 <br />November 30 - 0 0 <br />December 31 0 0 <br />Calendar year 1973 - - 0 <br /> <br />Acomita Reservoir.--Staff gage in SE% sec. 29, T. 10 N., R. 7 W., on San Fidel Arroyo; water <br />tor reserV01T is diverted from Rio San Jose. Completed in 1938; original capacity, 850 <br />acre-ft; present capacity 650 acre-ft on basis of 1956 sediment survey. Water is used for <br />irrigation on Acoma and Laguna Indian Reservations. <br /> <br />Month end contents in acre feet <br /> <br /> - - <br />Month Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Cal. yr. <br />Contents 640 630 610 585 522 438 296 232 320 380 494 620 - <br />Change +5 -10 -20 -25 -63 -84 -42 -64 +88 +60 +114 +126 -15 <br /> <br />