My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02737
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:39 PM
Creation date
10/11/2006 11:19:12 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.120
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1981
Title
Plan of Study: Grand Valley Unit Stage Two
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />B;) <br /> <br />~ <br />C'l <br />l'- <br />~ <br />o <br />o <br /> <br />CONTENTS <br /> <br />Chapter I Introduction <br />Purpose of plan of study <br />Purpose of the investigation <br />Background <br />Level of detail <br />Administration of the investigation <br />Description of the study area <br />Previous investigations <br />Current activities <br /> <br />Page <br />1 <br />1 <br />1 <br />3 <br />4 <br />5 <br />5 <br />6 <br />6 <br /> <br />Chapter II General approach to the work <br />Regulations and guidelines <br />Principles and Standards <br />Bureau of Reclamation Instructions <br />National Environmental Policy Act <br />Fish and Wildlife Coordination Act <br />Endangered Species Act <br />Flood Control Act <br />Executive Orders 11988 - Flood Plain <br />Management and 11990 - Protection <br />of Wetlands <br />Safe Drinking Water Act and Clean <br />Water Act <br />General water policy <br />Study organization <br />Lead agency <br />Grand Valley Salinity Coordinating <br />Committee <br />General public input <br /> <br />8 <br />8 <br />8 <br />8 <br />9 <br />9 <br />9 <br />10 <br /> <br />10 <br /> <br />10 <br />10 <br />11 <br />11 <br /> <br />11 <br />12 <br /> <br />Chapter III Plan formulation process <br />Identification of alternatives <br />Determination of selected plan <br /> <br />14 <br />14 <br />14 <br /> <br />Chapter IV <br /> <br />Bureau of Reclamation reports <br />Reports required <br />Responsibility for report preparation <br />Report reviews <br /> <br />15 <br />15 <br />15 <br />15 <br /> <br />Chapter V <br /> <br />Preconstruction activities <br /> <br />17 <br /> <br />Chapter VI <br /> <br />Time schedule <br /> <br />18 <br /> <br />Figures <br />Grand Valley Unit general map <br />Bar chart of proposed schedule <br /> <br />frontispiece <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.