My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02717
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:34 PM
Creation date
10/11/2006 11:18:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
822.600.10
Description
Colorado River Annual Operating Plan - Annual Reports
Basin
Colorado Mainstem
Date
1/1/2001
Author
USDOI/BOR
Title
Annual Operating Plan
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />THE SECRETA~l' OF' THE INTE~IO~ <br />'NASI-1INGTON <br /> <br />, <br />. <br /> <br />._~-,- <br />;"';;,.,~ <br /> <br />JAN 1 8 2001 <br /> <br />Honorable AJ Gore <br />President of the Senate <br />Washington, DC 20510 <br /> <br />Dear wlr President: <br /> <br />Enclosed is the 30tll Annual Report on the operation of the Colorado River which has been <br />prepared in compliance with the Colorado River Basin Project Act of Sept em her 3D, 1968, Pubtic <br />Law No. 90-537 (82 5t31.885). The report describes the actuaJ operation for water year 2000, for <br />the reservoirs along the Colorado River, constructed under the authority of the Colorado River <br />Storage Project Act and the Boulder Canyon Project Act. <br /> <br />The report also contains a projected plan of operation for water year 200 t. That plan was <br />prepared in late 2000 and is based on the most probable runoff conditions. The plan will be <br />modified if necessary as the year progresses due to any changes in runoff conditions The Bureau <br />of Reclamation wiU keep represenrari-"es ofehe Colorado River Basin States, Indian tribes and <br />other appropriate entities informed of any changes in the 200 I operating plan through the <br />Colorado Rjver Management Work Group_ <br /> <br />The reservOIr and river operations are kept in full compliance with the flood control regulations <br />established by the Army Corps of Engineers and with the HCriteria for Coordinated Long-Range <br />Operation of Colorado River Reservoirs," issued by the Secretary of the Interior on June 4, 1970, <br />in accordance with sect~on 602, Public Law 90-537. <br /> <br />Sincerely, <br /> <br />~~~ <br /> <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.