Laserfiche WebLink
<br />VI. Study Methods/Approach <br /> <br />L$ <br /> <br />I, Candidate restoration sites will be screened for contaminants <br />problems using a standard protocol developed using input from <br />contaminants experts (list attached). level I and level II <br />surveys will be conducted for each site (using standard <br />protocol attached). <br /> <br />VII. Task Description (FY 1995) <br /> <br />Sites to be screened, using standard protocol (attached), during FY <br />95 include: <br /> <br />-Escalante to Jensen (Snow's property) <br />-Baeser Bend <br />-Johnson Bottom <br />-Wyasket Bottom <br />-Bowknot Bend <br />-Potato Bottom <br />-Valentine Bottom <br />-Pike's <br />-Griffith's <br />-Gravel pits at 29 5/8 Road <br />-Confluence Park <br /> <br />Green River RM 302 <br />Green River RM 271 <br />Green River RM 262 <br />Green River RM 255 <br />Green River RM 68 <br />Green River RM 37 <br />Green River RM 28 <br />Colorado River RM 179 <br />Colorado River RM 176 <br />Colorado River RM 17~ <br />Gunnison River RM 57 <br /> <br />Note: Beginning in 1995, in-depth contaminants studles will be <br />conducted for Adobe Creek (Colorado River RM 160), Walter <br />Walker (Colorado River RM 164), and possibly Moab Slough <br />(Colorado River RM 63), which will take the place of <br />contaminants surveys. <br /> <br />VIII. Study Schedule <br /> <br />Task I. Site screening <br /> <br />Oct 1994 throu9h Sept 1995 <br /> <br />IX. FY 95 Work <br /> <br />-Description of Work <br />Task], See above. <br />-Deliverables (due date) <br />Reports of findings <br />-Budget <br />Task I - $ 50K <br /> <br />Dec 1995 <br /> <br />FY 96 Work <br /> <br />-Description of Work <br />Task I. See above. <br />-Deliverables (due date) <br />Reports of findings <br />-Budget <br />Task 1 - $ 50K <br /> <br />Dec 1996 <br /> <br />3 <br />