My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02694
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:27 PM
Creation date
10/11/2006 11:18:00 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.C.4
Description
UCRBRIP Flooded Bottom Lands
Basin
Colorado Mainstem
Date
1/1/1995
Author
UCRBRIP
Title
Floodplain Habitat Restoration - 1995 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VI. Study Methods/Approach <br /> <br />L$ <br /> <br />I, Candidate restoration sites will be screened for contaminants <br />problems using a standard protocol developed using input from <br />contaminants experts (list attached). level I and level II <br />surveys will be conducted for each site (using standard <br />protocol attached). <br /> <br />VII. Task Description (FY 1995) <br /> <br />Sites to be screened, using standard protocol (attached), during FY <br />95 include: <br /> <br />-Escalante to Jensen (Snow's property) <br />-Baeser Bend <br />-Johnson Bottom <br />-Wyasket Bottom <br />-Bowknot Bend <br />-Potato Bottom <br />-Valentine Bottom <br />-Pike's <br />-Griffith's <br />-Gravel pits at 29 5/8 Road <br />-Confluence Park <br /> <br />Green River RM 302 <br />Green River RM 271 <br />Green River RM 262 <br />Green River RM 255 <br />Green River RM 68 <br />Green River RM 37 <br />Green River RM 28 <br />Colorado River RM 179 <br />Colorado River RM 176 <br />Colorado River RM 17~ <br />Gunnison River RM 57 <br /> <br />Note: Beginning in 1995, in-depth contaminants studles will be <br />conducted for Adobe Creek (Colorado River RM 160), Walter <br />Walker (Colorado River RM 164), and possibly Moab Slough <br />(Colorado River RM 63), which will take the place of <br />contaminants surveys. <br /> <br />VIII. Study Schedule <br /> <br />Task I. Site screening <br /> <br />Oct 1994 throu9h Sept 1995 <br /> <br />IX. FY 95 Work <br /> <br />-Description of Work <br />Task], See above. <br />-Deliverables (due date) <br />Reports of findings <br />-Budget <br />Task I - $ 50K <br /> <br />Dec 1995 <br /> <br />FY 96 Work <br /> <br />-Description of Work <br />Task I. See above. <br />-Deliverables (due date) <br />Reports of findings <br />-Budget <br />Task 1 - $ 50K <br /> <br />Dec 1996 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.