Laserfiche WebLink
<br />:.' <br /> <br />..... <br />.:. <br />Cl') <br />..;:. <br /> <br />~n.C Rc~ion: St<lte: f\2~~. "Problem <br />Arkansas-White-Red Kansas 1104 ~(,il~ <br /> 5 <br />Problem Titl~: Time Period: <br />Ncosho Subarea, Lo....er Arkansas Baain, bank and channel 1975-1985 X <br /> erosion and stabilization. 1985-2000 )( <br /> - <br />Wat.eT Issues (Fresh 'Water, Marine. Est.uarine, Groundwater): <br />07-C7 There i, a possibility of providing cooling water from John Redmond <br /> Reservoir for therma 1 electric power generation. <br />Related Land Issues: <br />34-Bl,A2,GS,G8 Neosho River and principal tr ibutary, Cottonwood River, have <br /> bank erosiQn problems, with th~ main probl~m area developing <br /> below John Redmond Reservoir. <br />lnsti tulianal Issues: <br />61-81, G5 Hul ti-county units are involved in the basic problem. Studies <br />62-Gl, G5 carried out by the Corps of Engineers ident iEy some 114 areas <br /> of concern. <br /> ~ <br />FinancinR and Repayment Issues: <br />- <br />~ (inc luding interrelationships among issues) : <br />Description of Prob 1 ern Area: <br />Neosho River and principa tributary, Cottonwood River, in Kansas <br />Reference Sources: See Kansas reference Nos. 4, It, and 12. <br /> 2.9. <br />