My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02675
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:38:02 PM
Creation date
10/11/2006 11:16:59 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
10/1/1975
Title
Technical Memorandum on Problem Identification in the Arkansas-White-Red Region -- 1975 Water Assessment
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />C'" <br />.... <br />~ <br />~ <br />CO <br /> <br />W?.C R~hio:-,: ~: IIS~20.. Problem <br /> Arkansas 1104 I^.!ca ~ <br />Arkans8s-Wh1te-Red 6 <br />Prabl..::m Titl~: Time' Pcr iod: <br /> 1975-1985 X <br /> McClellan-Kerr Navigation Project 1985-2000 -X <br /> - <br />Water Issues IFresh Water, Marine, Estuarine, Groundwater}: <br />Ol-B4,C7,GZ,GB Operat.ion and ma in tenance and a1 terna tions to McClellan-Kerr to <br />07-El,Fl,F2,F3,F6 optimize and preserve beneficial outputs of the project in- : <br />03-Al,A2,Bl,B2 eluding all competing water uses and control of land use <br /> p lann ing to insure attainment of maximum access to and bene- I <br /> Hcisl use of the projec t.. Maintenance of qua li ty which <br /> mee ts UP}tS standards for M&I uses. Na tions 1 study on power I <br /> development in inland waterways. , <br />02-C8 CoelLog water for steam electric generat.ion. I <br /> power I <br />Related Land Issues: <br />30-A2, El Prevent flood ing of areas along channel in communities and in <br />31-AI, 81, 82 rural area. <br />34-AI,A2,BI,EI,FI, Elimination of bank erosion to control stabi U ty of navigation <br /> G2,GB channel end prevent sedimentat.ion and associated need for <br />35-G2,EI,fl dredging and fi lUng. <br />36-El,G2 <br />38-BS,C9,D6,EI,G9 There is need to prepare master plan for land uses along the <br /> wat.erway to prevent conflict in uses and to inslJre ach ievement <br /> of benefits. <br />Institutional Issues; <br />53, 54, 55 There ;, need for Federal, State, and local governments to work <br /> together to determine the best u,e and to protect the projec t. <br />Financing and Repayment Issues: <br />Other (InCluding Interrelationships among issues): <br />De~crlptlon 01 Problem Area: The McClellan-Kerr Navigation Projec t from Ca toosa <br />(upstream terminal to Pine Bluff exit from AWR) including the wa terway and related <br />land area problems and competing uses. <br />R",ference Sources: See State of Arkansas reference Nos. 18 and 20. <br /> 13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.