My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02645
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:55 PM
Creation date
10/11/2006 11:15:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
5700
Description
Flood Protection Section - Flood Control Projects
State
CO
Basin
Statewide
Date
7/1/1985
Author
BRW Inc - WRC Engine
Title
Feasibility Study for the Cherry Creek Basin Drainageway - for Cherry Creek Basin TAC and Parker-Jordan Metropolitan District
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />000994 <br /> <br />D. Method of Analysis <br /> <br />In general, the method of analysis followed the scope of services sum- <br />marized in Section I-B above. After collection and review of the basic data, <br />the sedimentation characteristics and the historic channel movements were noted <br />from the aerial photographs and field investigations. This information was <br />combi ned with the eva 1 uat i on of the ex i st i ng f1 ood i ng and stream stabi 1 ity <br />problems to develop various alternatives. The alternatives were discussed at <br />the September 20, 1984 meeting with the TAC and the various property owners. <br />The a lt ernat i ves were then combi ned to form the best a lternat i ve pl ans whi ch <br />were presented to the TAC and the property owners on October 18. 1984. At the <br />meeting, the potential sedimentation effects, the maintenance requirements, <br />relative capital costs, and the pro's and con's of each plan were discussed. <br />Individual meetings were then held with the primary impacted property owners to <br />aid in the selection of the best alternative. These alternatives were then <br />combined into the Selected Alternative Plan and a preliminary design with cost <br />estimates was prepared. A draft report was prepared and distributed to all <br />parties on May I, 1985. Written comments on the report were received from <br />Arapahoe County, the Urban Dra i nage and Flood Control Di stri ct, and several <br />property owners and their representatives. A final TAC meetin9 was held on <br />June 18. 1985, to review all the comments and proposed changes with the <br />committee. These comments have been incorporated into this final report. <br /> <br />To keep all the study participants informed of the progress and the <br />dec is ions, mi nutes of the meet i n9s between the TAC and the CONSULTANT were <br />distributed to all the participants. A list of the participants is presented <br />in Appendix-B and a copy of all meeting minutes is included in Appendix C. <br /> <br />E. Acknowledgements <br /> <br />The preparation of this report involved the efforts of many individuals <br />including the CONSULTANTS staff, representatives of the TAC, property owners <br />and other parties with interests in the project. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.