Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />000994 <br /> <br />D. Method of Analysis <br /> <br />In general, the method of analysis followed the scope of services sum- <br />marized in Section I-B above. After collection and review of the basic data, <br />the sedimentation characteristics and the historic channel movements were noted <br />from the aerial photographs and field investigations. This information was <br />combi ned with the eva 1 uat i on of the ex i st i ng f1 ood i ng and stream stabi 1 ity <br />problems to develop various alternatives. The alternatives were discussed at <br />the September 20, 1984 meeting with the TAC and the various property owners. <br />The a lt ernat i ves were then combi ned to form the best a lternat i ve pl ans whi ch <br />were presented to the TAC and the property owners on October 18. 1984. At the <br />meeting, the potential sedimentation effects, the maintenance requirements, <br />relative capital costs, and the pro's and con's of each plan were discussed. <br />Individual meetings were then held with the primary impacted property owners to <br />aid in the selection of the best alternative. These alternatives were then <br />combined into the Selected Alternative Plan and a preliminary design with cost <br />estimates was prepared. A draft report was prepared and distributed to all <br />parties on May I, 1985. Written comments on the report were received from <br />Arapahoe County, the Urban Dra i nage and Flood Control Di stri ct, and several <br />property owners and their representatives. A final TAC meetin9 was held on <br />June 18. 1985, to review all the comments and proposed changes with the <br />committee. These comments have been incorporated into this final report. <br /> <br />To keep all the study participants informed of the progress and the <br />dec is ions, mi nutes of the meet i n9s between the TAC and the CONSULTANT were <br />distributed to all the participants. A list of the participants is presented <br />in Appendix-B and a copy of all meeting minutes is included in Appendix C. <br /> <br />E. Acknowledgements <br /> <br />The preparation of this report involved the efforts of many individuals <br />including the CONSULTANTS staff, representatives of the TAC, property owners <br />and other parties with interests in the project. <br /> <br />-4- <br />