Laserfiche WebLink
<br />(\J <br />~ <br />t- <br />(.\1 <br /> <br />CONTENTS <br /> <br />PRELIMINARY <br />SUBJECT TO REVISION <br /> <br />Financial and Economic Analyses <br /> <br />Page <br />1 <br />1 <br />1 <br />2 <br />2 <br />5 <br />5 <br />5 <br />7 <br />7 <br />8 <br />8 <br />8 <br />8 <br />9 <br />9 <br />11 <br />11 <br />11 <br />14 <br />14 <br />14 <br />15 <br /> <br />Introduction. <br />Benefits. . . <br />Irrigation <br />Municipal water. <br />South Rifle area. <br />Rural areas . . . <br />Battlement Mesa PUD <br />Summary of municipal water benefits <br />Recreation . . . . . . . . . <br />Fish and wildlife. . . . . . <br />Agricultural benefit losses. <br />Direct benefit losses . <br />Indirect benefit losses <br />Summary of benefits. <br />Costs . . . . . . . . . . . . <br />Construction . . . . . . . <br />Interest during construction <br />Operation, maintenance, and replacements <br />Stream depletion . <br />Annual costs . . . . <br />Benefit-cost analysis . <br />Benefit-cost summary <br />Economic summary . . <br /> <br />Chapter I <br /> <br />Chapter II <br /> <br />. . <br /> <br />Plan Formulation <br /> <br />Introduction. . . . . . . . . . <br />Purpose and scope. . . . . . <br />Planning objectives, procedures, and limi- <br />tations. . . <br />Description of study area. <br />Location. . . <br />Stream system <br />Topography. . <br />Climate . . . <br />Previous investigations. <br />Western Slope Surveys <br />Colorado River Report <br />Cliffs-Divide Project Report. <br />West Divide Project Feasibility Report. <br />Modifications of plan. <br />Problems and needs. . . . <br />Irrigation . . . . . . <br />Municipal and domestic water <br />Other needs. . . . . . <br />Support for the project. . . <br /> <br />1 <br />1 <br /> <br />1 <br />2 <br />2 <br />2 <br />3 <br />4 <br />4 <br />4 <br />4 <br />5 <br />5 <br />5 <br />7 <br />7 <br />7 <br />9 <br />10 <br /> <br />!I <br /> <br />, I <br /> <br />,I <br />