Laserfiche WebLink
<br />RATES FOR RIO GRANDE PROJECT FI Rfl ENERGY <br /> <br />(Average Mills Per kWh at 58.2% Load Factor) <br /> <br />..... <br />..... <br /> <br /> 30.02 <br />!< Studies showed these rates were needed FY 1980 <br /> to accomplish project repayment, but STUDY <br /> rates were not put into effect because 26.28 <br /> alternative costs were lower. <br /> , FY 1980 <br /> 24.5* <br /> rFY 19741 STUDY <br /> STUDY I 21. 08 <br /> FY 1980 <br /> STUDY <br /> I 16,03 <br /> 15* I <br /> r FY 19"721 <br /> I STUDY I I 13.40 Option A Option B Option C <br /> C' I I I <br /> < , <br /> ,- I <br /> 1-* I 11.01 <br /> ..~ I I <br /> ...' I t <br /> ....:_~ I I <br /> 8.15 <br /> 7.12 <br /> ORIGINAL 6,64 <br /> STUDY FY 1947 <br /> STUDY <br /> 1940 ,1949 1974 1978 1979 1980 1982 1982 1982 <br /> <br />" <br />..... <br />G) <br />c <br />;0 <br />ITJ <br />N <br />