Laserfiche WebLink
<br />Energy Charge: <br /> <br />4,5 mills/kWh for the first 250 kWh/kW. <br /> <br />4.0 mills/kWh over 250 kWh/kW. <br /> <br />I~inimum Bill: <br /> <br />$1.00 per kW-month at Contract Rate of Del ivery (CROD). <br /> <br />Repayment studies made for Fiscal Year 1972 indicated a composite <br />rate of 15 mills was needed for project payout. However, to be compet i- <br />t i ve wi th other rates in the proj ect area, the rate was increas ed in <br />April 1974 to only 8.15 mills/kWh. The rate was termed SW-Fl and <br />included the following components: <br /> <br />Demand Ch arge: <br /> <br />$1.55 per kW-month. <br /> <br />Energy Charge: <br />4.5 mills/kWh, <br /> <br />I~inimum Bill: <br /> <br />$1.55 per kW-month at CROD. <br /> <br />Repayment studies made for Fiscal Year 1974 showed that a rate of <br />24,5 mills would be required for project payout. However, to be competi- <br />t ive with rates of other area power sources. the rate approved in 1978 <br />was limited to 16.03 mills. The rate was termed SW-F2R and was increased <br />in three phases to the following: <br /> <br />Demand Charge: <br />$2.13 per kW-month for April 1978 through March 1979. <br />$2.72 per kW-month for April 1979 through March 1980. <br />$3.20 per kW-month for April 1980 and thereafter. <br /> <br />Energy Charge: <br /> <br />6 mills/kWh for April 1978 through March 1979. <br /> <br />7 mills/kWh for April 1979 through March 1980. <br /> <br />H.5 mills/kWh for April 1980 and thereafter. <br /> <br />Billing Demand: <br /> <br />The bill ing demand is the greater of: the highest 30 minute <br />integrated demand measured during the month up to, but not in <br />excess of the delivery obli9ation under the power sales con- <br />tract; or the contract rate of delivery. <br /> <br />\-':,ll11: <br />j ~ . <br /> <br />8 <br />