My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02581
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:34 PM
Creation date
10/11/2006 11:13:26 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1983
Title
Report of the Rio Grande Compact Commission 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lot) <br />00 <br />'l'} <br />(.2fi <br />(. ) <br />j~:",~ <br /> <br />RIO GRANDE COMPACT COMMISSION REPORT <br /> <br />RECORDS OF DELIVERIES AND RELEASES <br /> <br />At the annual meeting of the Compact Commission on March 22, 1984 the records of deliveries and <br />releases for calendar year 1983 were examined and the computations of debits and credits based <br />thereon were reviewed. The records and computations as reviewed by the Commission are reproduced on <br />the next three pages. <br />The delivery of water in the Rio Grande at the Colorado-New Mexico State line was obtained from <br />the record of streamflow near Lobatos, Colorado; the obligations of Colorado to deliver water at the <br />State line was computed as prescribed in Article III. Item CS, the Reduction of Debits prescribed <br />in Article VI, was computed in accordance with the Rules and Regulations. <br />The delivery of water by New Mexico to Project Storage was computed from the actual streamflow <br />record and the record of operation of Elephant Butte Reservoir; the scheduled delivery was computed <br />as prescribed in the Resolution of the Commission adopted at the Tenth Annual Meeting, and published <br />in this report. Item NM4, Reduction of Debits by Evaporation, was computed in accordance with the <br />Rules and Regulations. The creation of a minimum recreation pool in Elephant Butte Reservoir was <br />initiated in December 1975 and is in accordance with a resolution adopted May 3, 1974. <br />The actual release from Project Storage during the year was measured at gaging stations below <br />Caballo Dam. The Accrued Departure from Normal Release is an under-release but is omitted in <br />accordance with a decision of the Commission at the meeting on February 15, 1968. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.