Laserfiche WebLink
<br />Chapter I <br /> <br />Chapter II <br /> <br />CONTENTS <br /> <br />Financial and Economic Analyses <br /> <br />Economic justification. <br />Introduction . <br />Benefits . . . . <br />Irrigation. . <br />Municipal and industrial water. <br />Fish and wildlife enhancement <br />Recreation. . . . . . . . . <br />Area redevelopment. . . . . <br />Agricultural benefit losses <br />Summary of benefits <br /> <br />Costs. . . . . . . . . <br /> <br />Construction costs. <br />Basin Fund costs <br />Section 8 costs. <br />Interest during construction. <br />Annual operation, maintenance, and re- <br />placement costs . . . . . . . . . . <br />Cost attributable to stream depletion <br />Externalities. . . . <br />Annual equivalent cost . . . <br />Benefit-cost comparison. . . <br />Benefit-cost summary tables. <br />Economic rate of return. <br />Cost allocation . . . . <br />Introduction . . . . . . <br />Method of allocation . . <br />Justifiable expenditures <br />Alternative costs. . . . <br />Irrigation. . . . . . <br />Municipal and industrial water. <br />Costs to be allocated. . . . . . . <br />Separable joint and specific costs. <br />Project costs without irrigation. . <br />Project costs without municipal and in- <br />dustrial water. . . . . . . . . . <br />Project costs without fish and wildlife <br />enhancement . . . . . . . . . . . . . <br />Preservation of archaeological resources. <br />Multiple-purpose project without Section 8 <br />facilities. . . <br />Allocation of costs. . . . . . . . . . . . . . <br /> <br />Page <br />1 <br />1 <br />2 <br />2 <br />3 <br />6 <br />6 <br />6 <br />8 <br />8 <br />12 <br />12 <br />12 <br />14 <br />14 <br /> <br />14 <br />14 <br />19 <br />19 <br />19 <br />20 <br />23 <br />25 <br />25 <br />25 <br />26 <br />26 <br />26 <br />27 <br />30 <br />30 <br />30 <br /> <br />33 <br /> <br />33 <br />33 <br /> <br />34 <br />34 <br />