Laserfiche WebLink
<br />, <br />. <br />, <br /> l~ <br />.;,.~ <br />.--. <br />.~ <br /> - <br /> ..-' <br />f.":: <br /> <br />PROJECT STATISTICS <br />GRAND VALLEY UNIT <br /> <br />'. <br /> <br />ESTIMATED COSTS <br /> <br />OVERALL UNIT <br />WATER SYSTEMS IMPROVEMENT <br />CONSTRUCTION COSTS <br />(JANUARY 1977 PRICES) <br /> <br />CANAL Ll N I NG <br />LATERAL IMPROVEMENT <br />FIELD STATION <br />LESS SALVAGE AND DEPRECIATION <br />WILDLIFE MEASURES <br />INVESTIGATION COSTS <br />SUBTOTAL <br />IRRIGATION MANAGEMENT SERVICES <br />, SUBTOTAL <br />ON-FARM IMPROVEMENTS <br />UNIT TOTAL <br /> <br />i . <br /> <br />EFFECTS ON THE COLORADO RIVER <br /> <br />OVERALL UNIT <br />REDUCTION IN SALT LOADING (TONS/YEAR) <br />BY WATER SYSTEMS IMPROVEMENT <br />BY ON-FARM IMPROVEMENTS AND IMS <br />TOTAL <br />INCREASE IN STREAMFLOW (ACRE-FEET/YEAR) <br /> <br />REDUCTION IN SA~INITY CONCENTRATION AT <br />IMPERIAL DAM (MG/l) <br />BY WATER SYSTEMS IMPROVEMENT <br />BY ON-FARM IMPROVEMENT AND IMS <br />TOTAL <br /> <br />STAGE ONE (WATER SYSTEMS IMPROVEMENT ON~Y) <br />REDUCTION IN SALT LOADING (TONS/Y~AR) <br />INCREASE IN STREAMFLOW (ACRE-FEET/YEAR) <br />REDUCTION IN'SALINlTY CONCENTRATION <br />AT IMPERIAL DAM (MG/l) <br /> <br />8 <br /> <br />$73,200,000 <br />66,000,000 <br />160,000 <br />-75,000 <br />6,515,000 <br />300,000 <br />.rJ,46 , 100,000 <br />250,000 <br />[J.46,350,000 <br />23,620,000 <br />$169,970,000 <br /> <br />280,000 <br />130,000 <br />410,000 <br />4,000 <br /> <br />29 <br />14 <br />n <br /> <br />28,000 <br />200 <br /> <br />2.9 <br />