Laserfiche WebLink
<br />~.~---;- <br /> <br />10 <br /> <br />';8"'r.- <br />oJ' 0 <br /> <br />MISSOURI RIVER BASIN <br /> <br />'.~ ' <br />":,~ <br />..i.. <br />~t.. <br />., <br />,""-.. <br /> <br />~ <br /> <br />., <br /> <br />the mouth with the request that you ,furnish <br />Dlent there~n as soon as practicable. <br />Very truly yours, <br /> <br />me with your com- <br /> <br />E., REYBOLD, <br />Major GeneraI, Ohi4 of Engineer". <br /> <br />COMMENTS OF THE FEDERAL POWER COMMISSION <br /> <br />FEDERAL POWER COMMISSION, <br />TVashington, December 14, 1943. <br />Maj. Gen. E. n"YBOLD. <br />Chief of Engineers, 'Irar Depa,rtment, <br />, TVashingtan, D. 0, <br /> <br />l'lEAR GENERAL REYDOLD: Reference is m,"le to your letter of <br />August 28, 1943, transmitting copies of the reports of the division <br />C"igilleer and of tile Board of Engineers for RlVers and Harbors on \.Ire <br />.\\,~ a.r De'part.ment's a.uthorized survey of the 11issouri. River, SiotLX <br />City, Iowa, to the mouth, und requesting COlUments of this Commission <br />thereon, <br />The repor's of your Depar,ment were made in respon'" to the resolu- <br />tion adopted Miry 13, 1943, by the Committee on Flood Con,rol, <br />House of Representatives, req uesting the Board of E;'ngineers for <br />Rivers and Harbors t.o review the report on t.he ~-1issouri R~v(':r eon.. <br />tained in House Document No. 238, Seventy-third Congress, second <br />session, omI House Document No. 821, Seventy-sLxth Congress, third <br />session, with a view t.o determining \\:het.her any 11lodificfttion should <br />be nUl<le therein at this time wit.h 'respeet to flood eoittrol along tho <br />moin ~ti!tn of the M;ssouri Riyer from Sioux Cit.y, lowl1, to .ts mouth. <br />The B'oardpf Engineers for Rivers and Harbors, after re.view and <br />consideration of t.l:w report of your division engineer, recommelld9 <br />modification of the, I1pproyed gcneml comprehensive plan for flood <br />control und other purposes in t,he lVlissouri Riyer Basin. The revised <br />plan would include 12 ltdditional multiple-purpose resen~oirs, works to .'~ ~. <br />divert water to the Devils Lake and James River.Basin regions, and a. ."~-~- <br />system of levees and similar in1provenlcnts along the !vlissouri River ;.~, . <br />between Sioux City and the l1Io",h, in general aeeord,moe with the <br />plan of thwdivisioll engineer! as sllOwn 011 t.11e map accompanying his <br />roport. with suoh modifioations thereof flU,l changes therein as the <br />Seeretllry of War and the Chief of Engineers nl/lY find adyisablC. The <br />cost,.~o I,ho United Stutes of 'these additionAl works is estirirated ut <br />$481,BOO,OOO.. , <br />The Commission's staff has reviewed the reports and reconuIlcnda- <br />tiol1s-in the light of yo.rio\ls st\H.hcs made in eonnect.ion wit,h problems <br />of t,he Missouri River Basin. While. there has been no opportunity for <br />detmled study of the. projects presently suggestel). fo,' inclusion in <br />t~e comprehensive plan, the stuff imlicates thut it is ill general accord <br />wlt,h the recommcndations as providing a hro~\(l bnsis.for improyerncut <br />of the basin. The staff properly points vut that t.he details mllst, of <br />necessity, be worked Ollt step by st'ep and the authorizing legislation <br />shol-lid, therefore, pcnni, wide, latitude in the sel'eotion and modifica- <br />tion of projects. ' <br />The proposed cOInprehensive p]an should go far toword resolviug <br />present conflicts of in'erest in the use of the water resources of .the <br />hllSlU. These conflicts arise because of insufficiency of usable water, <br />