My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02536
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:24 PM
Creation date
10/11/2006 11:11:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
10/31/1938
Author
Roberts A. B.
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />WC~.. ,,,,,,,",,,,,,,.,~. <br />1:-'Y~"~:i>': ~ - : . ' <br /> <br />N <br />C\J <br /> <br />., <br /> <br />. <br /> <br />. <br /> <br />" "~:;:"<::?~_~""R.'"-^''''''' . ~~::~"':' _,4. - <br /> <br />'--<:~~f:~\;rt""".:'"t.-;. '-::r~",p--~' "." 'T' <-~.. -~'~ ~,IIL... <br />" ';''''''':~''''':':~';~'/ ."*'~f'~:"~~ <br /> <br />A. B. ROBeRTS <br />CONSULTING eNGINeeR <br /> <br />SWeTLAND &LDG. <br />CLI!W~LAND <br /> <br />SECTIon III <br />of <br /> <br />RSPORT BY A. B. ROBLRT3 <br /> <br />RZVIE?: OF STUDY NlIDE BY <br />THE BUR3AU OF P01,'ER MID LIGHT <br />OF THE VALUE OF FALLING lIJ~R-FORP~rARY ENERGY <br />--p;,rf BOULDER DAM <br /> <br />In reviewing the Study S-l, 8-2 prepared by <br />engineers of the Bureau of Power and Light, it should be <br />noted that their studies are based upon what thev actually <br />are doing in the '^lav of planninfl and investments in order <br />to secure reliable service for matronolitan Los Angeles, <br />and that in every substantial resuect thev correspond with <br />best practices of major utilities elsewhere applied to <br /> <br />existing conditions. In this respect, I think they have <br />endeavored to be fair in their assumptions. <br />The assumptions used bV the enl"ineers of the <br /> <br />Bureau are that tho present two circuits and appurtenant <br />generating facilities at Boulder were built for the sole <br />purpose of delivering primary energy contracted for by <br /> <br />the Cities of Los Angeles, Pasadena, Glendale, and Bur- <br />bank, who are n01ll operating under a joint transmission <br />contract for delivary of their primary energy over the <br />present two circuits, and that tho proposed third circuit <br />and appurtenant g8nerating facilities are to bo built for <br />
The URL can be used to link to this page
Your browser does not support the video tag.