Laserfiche WebLink
<br />00317) <br />., <br /> <br />. <br /> <br />JOINT O. & M. ANALYSIS <br />Full Year, 1966 <br /> <br />Base Year Analysis <br /> <br />5-Year Average Analysis <br /> <br />Di fference <br />% Oiff. <br /> <br />$315,830.28 <br />423,884.00 <br />(108,053.72) <br />134% <br /> <br />5-Year Average <br />1966 <br /> <br />Difference <br />% Diff. <br /> <br />$396,231. 64 <br />423,884.00 <br />+ 27,652.36 <br />107% <br /> <br />Base Year (1957) <br />1966 <br /> <br />~'t' * "k ~~~ ,'f * '1: * * * * ,', ..'t -!( ...., ,,: ";t ,', -I, of( ,', ...,: ...'( ...., ...'c * <br /> <br /> 1966 Difference <br /> AVERAGE ANALYSIS Tote I Year 5-Year Avg. From Avq. <br /> Operation and Maintenance <br /> Storaqe Works <br /> Green Mountain Dam & Reservoir $ 2,821.00 $ 3,04a.15 - $ 227.15 <br /> Lake Granby and Dam 9,134.00 12,651.47 3,517.47 <br />, Willow Creek Dam and Reservoi r 12,430.00 10,968.82 + 1,461. 18 <br /> Shadow Mountain Lake and Dam 5,791.00 8,625.13 2,834.13 <br /> Carter Lake and Dams 9,715.00 5,805.86 + 3,9()9.14 <br /> Horsetooth Dams, Dike, Reservoir 9,422.00 9,506.06 84.06 <br />. <br /> Sub- Tota 1 $ 49,313.00 $ 50,605.49 - $ 1,292.49 <br /> Pumping Works <br /> Granby Pump Plant - electric powe r $ 71,874.00 $ 65,834.83 + $ 6,039.17 <br /> othe r 120,920.00 102,659.84 + la,260.16 <br /> Willow Creek Pump - electri c power 11,048.00 12,230.76 1,182.76 <br /> othe r 32,398.00 21,855.01 + 10,542.99 <br /> Sub-Total $236,240.00 $202,580.44 + $]3,659.56 <br /> Transmission Works <br /> Adams Tunnel Cable $ 3,518.00 $ 2,892.31 + $ 625.69 <br /> East Portal - Estes Power Plant Line 0.00 218.20 218.20 <br /> Granby Pump Plant - West Portal Line 0.00 412.00 412.00 <br /> Colo. River Improvement Lines - 12- 5KV 740.00 1,130.00 290.00 <br /> Willow Creek Pump Plant Line - 69 KV 0.00 60.aO 60.80 <br /> Power Supply Line, Carter Lake, pres- <br /> sure conduit to Flatiron Switchyard 0.00 51.40 51. 40 <br /> Willow Creek Pump Plant to Granby Dam 0.00 20.60 20.60 <br /> Granby Pump Plant Switchyard 353.00 690.40 337.40 <br /> Willow Creek Pump Plant Switchyard 38.00 473.32 435.32 <br /> Big Thompson Siphon to City of Loveland 0.00 0.00 <br /> Sub- Tota 1 $ 4,649.00 $ 5,949.03 - $ 1,300.03 <br />